Easy BACnet
  1. Home
  2. BACnet points lists
  3. Schneider Electric
  4. iEM3465 / iEM3565 energy meter (BACnet MS/TP)

Power and energy meter (BACnet MS/TP) · BACnet points list

Schneider Electric iEM3465 / iEM3565 energy meter (BACnet MS/TP) BACnet points list

Updated 12 November 2026

Short answer

The iEM3465 and iEM3565 are three-phase DIN-rail energy meters that take low-voltage CTs or Rogowski coils directly, with a BACnet MS/TP port. They serve Analog Inputs for current, voltage, power, power factor, frequency, total, partial, per-phase and per-tariff energy, demand and peak demand, plus meter and I/O configuration readbacks, one Analog Value for commands and seven Binary Inputs for I/O and the overload alarm. The object list matches the iEM3165/3265/3365 list plus twelve demand objects (AI 60-71).

This page lists 76 BACnet objects for the Schneider Electric iEM3465 / iEM3565 energy meter (BACnet MS/TP) — 1 of them writable — with each object’s type, instance number, name, engineering units and access. It is re-typed from Schneider Electric’s own free documentation, linked below.

Manufacturer
Schneider Electric
Model
iEM3465 / iEM3565 energy meter (BACnet MS/TP)
Equipment
Power and energy meter (BACnet MS/TP)
Equipment type
Thermostats, sensors & meters
BACnet objects
76 (1 writable)
Transport
BACnet MS/TP
Firmware
BACnet V2.4 or later for the demand objects
Also known as
iEM3465, iEM3565, iEM3400 BACnet, iEM3500 BACnet, iEM3X65, 7EN02-0438
Source document
iEM3400 / iEM3500 series energy meters user manual, 'Communications using BACnet' · 7EN02-0438-15 · rev. 05/2026
Download CSV 76 rows Download EDE B.I.G.-EU JSON Manufacturer PDF ↗ Compare with your scan Download Easy BACnet Mobile App Google Play

Reference only, provided as-is: verify against Schneider Electric’s current documentation and the live device before use. Not official Schneider Electric information. Terms of use.

BMS integration notes: Schneider Electric iEM3465 / iEM3565 energy meter (BACnet MS/TP)

Integration in brief

At the front panel set the MS/TP baud rate, MAC address and device ID, then read energy import (AI 27), total active power (AI 22), demand (AI 60), current, voltage and power factor. Read BI 05 if the overload alarm is used. Write AV00 only to reset partial counters or acknowledge alarms.

Minimum points to map

The short list most integrators start with — enough to run the unit from a BMS. Map more as the job needs.

ObjectNameWhyAccess
AI 27AI27 - Total active energy importImported active energy, WhRead
AI 22AI22 - Active Power TotalTotal active power, kWRead
AI 60AI60 - Demand active powerActive power demand, kWRead
AI 25AI25 - Power Factor TotalTotal power factorRead
AI 10AI10 - Current AverageAverage phase current, ARead
AI 18AI18 - Voltage Average L-NAverage line-to-neutral voltageRead
AI 26AI26 - FrequencySupply frequencyRead
BI 5BI05 - Alarm StatusOverload alarm activeRead

Network setup

Watch out for

Schneider Electric iEM3465 / iEM3565 energy meter (BACnet MS/TP) BACnet objects

Type: AI, AO, AV, BI, BO, BV, MI/MO/MV (multi-state) · Access: Read read-only, Write writable, Command writable with a priority array.

76 of 76 shown
Type
Binary
Access
Show
Schneider Electric iEM3465 / iEM3565 energy meter (BACnet MS/TP) BACnet Points List
DescriptionStates
AI0AI00 - BACnet MAC AddressMS/TP MAC address (set at the front panel)Read
AI1AI01 - BACnet Baud RateMS/TP baud rate (set at the front panel)Read
AI2AI02 - Pulse DurationEnergy pulse width of the digital outputmsRead
AI3AI03 - Pulse WeightPulses per unit, digital input in input-metering modeRead
AI4AI04 - Pulse ConstantPulses per kWh of the digital outputRead
AI5AI05 - Digital Input ModeDigital input functionRead0=Normal (input status), 2=Multi Tariff control, 3=Input metering, 5=All partial energy logs reset
AI6AI06 - Digital Output ModeDigital output functionRead2=Alarm, 3=Energy, 65535=Disabled
AI7AI07 - Current Phase 1ARead
AI8AI08 - Current Phase 2ARead
AI9AI09 - Current Phase 3ARead
AImin10AI10 - Current AverageARead
AI11AI11 - Voltage L1-L2VRead
AI12AI12 - Voltage L2-L3VRead
AI13AI13 - Voltage L3-L1VRead
AI14AI14 - Voltage Average L-LVRead
AI15AI15 - Voltage L1-NVRead
AI16AI16 - Voltage L2-NVRead
AI17AI17 - Voltage L3-NVRead
AImin18AI18 - Voltage Average L-NVRead
AI19AI19 - Active Power Phase 1kWRead
AI20AI20 - Active Power Phase 2kWRead
AI21AI21 - Active Power Phase 3kWRead
AImin22AI22 - Active Power TotalkWRead
AI23AI23 - Reactive Power TotalkVARRead
AI24AI24 - Apparent Power TotalkVARead
AImin25AI25 - Power Factor TotalRead
AImin26AI26 - FrequencyHzRead
AImin27AI27 - Total active energy importKept through power failuresWhRead
AI28AI28 - Total active energy exportKept through power failuresWhRead
AI29AI29 - Total reactive energy importKept through power failuresWhRead
AI30AI30 - Total reactive energy exportKept through power failuresWhRead
AI31AI31 - Partial active energy importResettable partial counterWhRead
AI32AI32 - Partial reactive energy importResettable partial counterWhRead
AI33AI33 - Active energy import phase 1WhRead
AI34AI34 - Active energy import phase 2WhRead
AI35AI35 - Active energy import phase 3WhRead
AI36AI36 - AccumulationInput metering accumulation (pulse input)Read
AI37AI37 - Tariff Energy Active RateActive tariffRead0=Multi tariff disabled, 1=Rate A, 2=Rate B, 3=Rate C, 4=Rate D
AI38AI38 - Rate A (Tariff 1) active energy importWhRead
AI39AI39 - Rate B (Tariff 2) active energy importWhRead
AI40AI40 - Rate C (Tariff 3) active energy importWhRead
AI41AI41 - Rate D (Tariff 4) active energy importWhRead
AI42AI42 - Pickup SetpointActive power alarm pickup setpointkWRead
AI43AI43 - Last Alarm ValueValue at the last alarmkWRead
AI44AI44 - Meter operation timeTime since the meter last powered upSecondsRead
AI45AI45 - Number of phases1 or 3Read
AI46AI46 - Number of wires2, 3 or 4Read
AI47AI47 - Power system typeWiring configurationRead0=1PH2W L-N, 1=1PH2W L-L, 2=1PH3W L-L with N, 3=3PH3W, 11=3PH4W, 13=1PH4 wire multi L-N
AI48AI48 - Nominal frequency50 or 60HzRead
AI49AI49 - Number of VTs0-10Read
AI50AI50 - VT PrimaryVRead
AI51AI51 - VT SecondaryVRead
AI52AI52 - Number of CTs1, 2 or 3Read
AI53AI53 - CT PrimaryARead
AI54AI54 - CT SecondaryARead
AI55AI55 - VT connection typeRead0=Direct connection, no VTs, 1=3PH3W (2 VTs), 2=3PH4W (3 VTs)
AImin60AI60 - Demand active powerActive power demandkWRead
AI61AI61 - Demand active power peakPeak active power demandkWRead
AI62AI62 - Demand reactive powerReactive power demandkVARRead
AI63AI63 - Demand reactive power peakPeak reactive power demandkVARRead
AI64AI64 - Demand apparent powerApparent power demandkVARead
AI65AI65 - Demand apparent power peakPeak apparent power demandkVARead
AI66AI66 - Demand current phase 1Current demand, phase 1ARead
AI67AI67 - Demand current phase 1 peakPeak current demand, phase 1ARead
AI68AI68 - Demand current phase 2Current demand, phase 2ARead
AI69AI69 - Demand current phase 2 peakPeak current demand, phase 2ARead
AI70AI70 - Demand current phase 3Current demand, phase 3ARead
AI71AI71 - Demand current phase 3 peakPeak current demand, phase 3ARead
AV0AV00 - CommandWrite a command code to the meterWrite20001=Acknowledge overload alarm, 2020=Reset partial energy counters, 2023=Reset input metering counter
BI0BI00 - Digital Output EnableDigital output used as active energy pulse outputRead0=Disabled, 1=Energy pulse output
BI1BI01 - Digital Input Association EnableDigital input used for input meteringRead0=Not associated, 1=Associated
BI2BI02 - Digital Input StatusDigital input contact state (input status mode)Read0=Relay open, 1=Relay closed
BI3BI03 - Alarm EnableOverload alarm enabledRead0=Disabled, 1=Enabled
BI4BI04 - Digital Output Association EnableDigital output used for the overload alarmRead0=Disabled, 1=Alarm
BImin5BI05 - Alarm StatusOverload alarm activeRead0=Inactive, 1=Active
BI6BI06 - Unacknowledged statusHistoric alarm not yet acknowledgedRead0=Acknowledged, 1=Unacknowledged
Object ID lookup: Schneider Electric iEM3465 / iEM3565 energy meter point IDs by name

Integration notes

Check it against the live device. A points list tells you what the controller can expose; the unit in front of you may differ by firmware or installed options. This list is provided as-is for reference only and may contain mistakes — confirming it before you write, map or commission anything is up to you (terms). Easy BACnet scans a network for BACnet IP devices from an Android phone, reads every object on the iEM3465 / iEM3565 energy meter (BACnet MS/TP) and exports what it actually has to Excel — free. New to BACnet? Start with what a BACnet points list is and what the object types mean.

Questions about the Schneider Electric iEM3465 / iEM3565 energy meter (BACnet MS/TP)

How many BACnet points does the Schneider Electric iEM3465 / iEM3565 energy meter (BACnet MS/TP) have?

This list has 76 BACnet objects: 68 analog inputs, 1 analog value, 7 binary inputs. The exact set on a given unit depends on its firmware, installed options and configuration.

Which Schneider Electric iEM3465 / iEM3565 energy meter (BACnet MS/TP) BACnet points are writable?

1 of the 76 objects accept a write. Points marked Command have a priority array: a write holds until it is released, so release it back to automatic when you are done.

Where is the official Schneider Electric iEM3465 / iEM3565 energy meter (BACnet MS/TP) BACnet documentation?

The source is iEM3400 / iEM3500 series energy meters user manual, 'Communications using BACnet' (7EN02-0438-15), revision 05/2026, published free by Schneider Electric at https://download.se.com/files?p_Doc_Ref=7EN02-0438.

What are the minimum BACnet points to integrate the Schneider Electric iEM3465 / iEM3565 energy meter (BACnet MS/TP)?

Start with AI 27 AI27 - Total active energy import (Imported active energy, Wh); AI 22 AI22 - Active Power Total (Total active power, kW); AI 60 AI60 - Demand active power (Active power demand, kW); AI 25 AI25 - Power Factor Total (Total power factor); AI 10 AI10 - Current Average (Average phase current, A); AI 18 AI18 - Voltage Average L-N (Average line-to-neutral voltage); AI 26 AI26 - Frequency (Supply frequency); BI 5 BI05 - Alarm Status (Overload alarm active).

How do I check these points on the real iEM3465 / iEM3565 energy meter (BACnet MS/TP)?

Scan the network with a BACnet IP browser such as Easy BACnet, open the device and compare its object list with this table. Anything missing is usually an option that isn't installed or a point that is disabled in the controller's configuration.

More Schneider Electric BACnet points lists

Source: iEM3400 / iEM3500 series energy meters user manual, 'Communications using BACnet' · 7EN02-0438-15 · rev. 05/2026. Object names, instances and units are reproduced as published; descriptions are our own.