- Home
- BACnet points lists
- Cleaver-Brooks
- Hawk ICS boiler control (ProtoNode)
Steam or hot water boiler control via BACnet gateway · BACnet points list
Cleaver-Brooks Hawk ICS boiler control (ProtoNode) BACnet points list
Updated 7 November 2026Unofficial source
A read-only ProtoNode profile for the Hawk ICS boiler control: alarm and status bits (limits, actuators, flame safeguard, O2, sensor failures), firing-rate modes, flame strength, firing rate, O2, setpoints, steam pressure or water temperature, stack and economizer temperatures, burner status lines, run time and cycles.
This page lists 140 BACnet objects for the Cleaver-Brooks Hawk ICS boiler control (ProtoNode) — 0 of them writable — with each object’s type, instance number, name, engineering units and access. It is re-typed from a copy of Cleaver-Brooks’s documentation hosted by watmfg.com, not by Cleaver-Brooks itself, so treat it as unofficial.
- Manufacturer
- Cleaver-Brooks
- Model
- Hawk ICS boiler control (ProtoNode)
- Equipment
- Steam or hot water boiler control via BACnet gateway
- Equipment type
- Boilers & water heaters
- BACnet objects
- 140 (0 writable)
- Transport
- BACnet MS/TP, BACnet IP
- Firmware
- Not stated
- Default device instance
- 50000 + Modbus Node-ID
- Also known as
- Hawk ICS, CB ICS, ProtoNode RER, 750-426
- Source document
- Cloud Enabled ProtoNode Gateway Startup Guide (RER/LER) for interfacing Cleaver-Brooks products · 750-426 · rev. 03/2018 (unofficial copy, hosted by watmfg.com)
Reference only, provided as-is: verify against Cleaver-Brooks’s current documentation and the live device before use. Not official Cleaver-Brooks information. Terms of use.
BMS integration notes: Cleaver-Brooks Hawk ICS boiler control (ProtoNode)
Read-only. Map load demand, steam pressure or water temperature, setpoint, firing rate and the alarm output.
Minimum points to map
The short list most integrators start with — enough to run the unit from a BMS. Map more as the job needs.
| Object | Name | Why | Access |
|---|---|---|---|
| BI 57 | Boiler Load Demand | Boiler load demand | Read |
| BI 47 | Remote enable input | Remote enable input | Read |
| AI 9 | Steam Pressure or HW Temp | Steam pressure or hot water temperature | Read |
| AI 7 | Set Point Steam Pressure/Water Temp | Active setpoint | Read |
| AI 5 | Firing Rate | Firing rate | Read |
| BI 42 | Main Fuel Valve Open | Main fuel valve open | Read |
| BI 55 | Alarm Output | Alarm output | Read |
| AI 28 | Brnr Control Status Line 1 Honeywell | Burner control status line 1 (Honeywell) | Read |
Network setup
- BACnet Device Instance = the controller's Modbus Node-ID + Node_Offset (default 50,000), so Node-ID 1 = 50001. Change Node_Offset in the ProtoNode web configurator to pick other instances.
- The ProtoNode RER does BACnet MS/TP or BACnet IP, selected on its S bank DIP switches.
- BACnet MS/TP: one MAC address (1-127) for the whole ProtoNode on the A bank DIP switches; baud on B0-B3 (38400 factory default).
- BACnet IP: default ProtoNode address 192.168.1.24; change it in the web configurator.
Watch out for
- Elapsed time and cycle counts appear twice: as two 16-bit word objects and as single objects.
Cleaver-Brooks Hawk ICS boiler control (ProtoNode) BACnet objects
Type: AI, AO, AV, BI, BO, BV, MI/MO/MV (multi-state) · Access: Read read-only, Write writable, Command writable with a priority array.
| Description | States | |||||
|---|---|---|---|---|---|---|
| BI | 1 | Drive Fault | Read | |||
| BI | 2 | Modbus Com Error | Read | |||
| BI | 3 | Low Water | Read | |||
| BI | 4 | BC Alarm | Read | |||
| BI | 5 | Boiler Limits Open | Read | |||
| BI | 6 | High Stack Temp Alarm | Read | |||
| BI | 7 | High Stack Temp SD | Read | |||
| BI | 8 | External Interlock | Read | |||
| BI | 9 | I/O module fault | Read | |||
| BI | 10 | Steam Sensor Fail | Read | |||
| BI | 11 | Air Drive out of Position Alarm | Read | |||
| BI | 12 | Gas Drive out of Position Alarm | Read | |||
| BI | 13 | F/A Ratio Controller Fault | Read | |||
| BI | 14 | No Fuel Selected | Read | |||
| BI | 15 | Low Clogix Battery | Read | |||
| BI | 16 | Non Recycle Limit Relay Fail | Read | |||
| BI | 17 | Recyle Limit Relay Fail | Read | |||
| BI | 18 | Remote Modulation Signal Fail | Read | |||
| BI | 19 | Header Sensor Fail | Read | |||
| BI | 20 | TC Channel Fail | Read | |||
| BI | 21 | Low O2 Alarm | Read | |||
| BI | 22 | High Limit Alarm | Read | |||
| BI | 23 | ALWCO | Read | |||
| BI | 24 | Low Gas Pressure/Low Oil Temp | Read | |||
| BI | 25 | High Gas Pressure/High Oil Temp | Read | |||
| BI | 26 | Low Oil Pressure | Read | |||
| BI | 27 | High Oil Pressure | Read | |||
| BI | 28 | Oil Drawer Switch Not Made | Read | |||
| BI | 29 | Low Atomizing Air Pressure | Read | |||
| BI | 30 | Low Combustion Air Pressure | Read | |||
| BI | 31 | AUX Alarm 1 | Read | |||
| BI | 32 | AUX Alarm 2 | Read | |||
| BI | 33 | Blower On | Read | |||
| BI | 34 | Purge Input | Read | |||
| BI | 35 | Release To modulate Input | Read | |||
| BI | 36 | Low Fire Switch | Read | |||
| BI | 37 | High Fire Switch | Read | |||
| BI | 38 | Ready to start/Limits Closed | Read | |||
| BI | 39 | External Start Interlock | Read | |||
| BI | 40 | ALFCO | Read | |||
| BI | 41 | Pilot | Read | |||
| BImin | 42 | Main Fuel Valve Open | Read | |||
| BI | 43 | Fuel 1 Selected | Read | |||
| BI | 44 | Fuel 2 Selected | Read | |||
| BI | 45 | FSG Alarm | Read | |||
| BI | 46 | LWCO Shutdown | Read | |||
| BImin | 47 | Remote enable input | Read | |||
| BI | 48 | Burner Switch | Read | |||
| BI | 49 | Recycle Limit Relay | Read | |||
| BI | 50 | External Device Start | Read | |||
| BI | 51 | Non Recycle Limit Relay | Read | |||
| BI | 52 | Drive to Low Fire (FARC) | Read | |||
| BI | 53 | Start Slave Blr (2 Blr LL) | Read | |||
| BI | 54 | Load Demand Output | Read | |||
| BImin | 55 | Alarm Output | Read | |||
| BI | 56 | Boiler Ready (LL) | Read | |||
| BImin | 57 | Boiler Load Demand | Read | |||
| BI | 58 | Firing Rate Remote/Llag | Read | |||
| BI | 59 | Firing Rate Manual | Read | |||
| BI | 60 | Firing Rate Auto | Read | |||
| BI | 61 | Hot Stand By | Read | |||
| BI | 62 | Warm Up | Read | |||
| BI | 63 | Fuel 3 Selected | Read | |||
| BI | 64 | Aux Alarm 3 | Read | |||
| BI | 65 | Steam or Hot Water | Read | |||
| BI | 66 | Level Master Present | Read | |||
| BI | 67 | Variable Speed Drive Present | Read | |||
| BI | 68 | Economizer Present | Read | |||
| BI | 69 | Combustion Air Temp Present | Read | |||
| BI | 70 | Oil Temp Sensor Present | Read | |||
| BI | 71 | O2 Analyzer Present | Read | |||
| BI | 72 | Feedwater or Return Temp Present | Read | |||
| BI | 73 | Outdoor Reset Selected | Read | |||
| BI | 74 | Parallel Positioning Selected | Read | |||
| BI | 75 | Two boiler lead lag master select | Read | |||
| BI | 76 | Two boiler lead lag slave select | Read | |||
| BI | 77 | Master panel select | Read | |||
| BI | 78 | Hot stand by select | Read | |||
| BI | 79 | Dual setpoint select | Read | |||
| BI | 80 | Gas Flow Select | Read | |||
| BI | 81 | Oil Flow Select | Read | |||
| BI | 82 | Steam Flow Select | Read | |||
| BI | 83 | Water Flow Select | Read | |||
| BI | 84 | Honeywell or Fireye | Read | |||
| BI | 85 | High Water Alarm | Read | |||
| BI | 86 | Oil Drive out of Position Alarm | Read | |||
| BI | 87 | FGR Drive out of Position Alarm | Read | |||
| BI | 88 | Air Actuator FB Alarm Low | Read | |||
| BI | 89 | Air Actuator FB Alarm High | Read | |||
| BI | 90 | Fuel1 Actuator FB Alarm Low | Read | |||
| BI | 91 | Fuel1 Actuator FB Alarm High | Read | |||
| BI | 92 | Fuel2 Actuator FB Alarm Low | Read | |||
| BI | 93 | Fuel2 Actuator FB Alarm High | Read | |||
| BI | 94 | FGR Actuator FB Alarm Low | Read | |||
| BI | 95 | FGR Actuator FB Alarm High | Read | |||
| BI | 96 | VSD Deviation Alarm | Read | |||
| AI | 1 | Flame Strength Honeywell | Modbus 30001 | Read | ||
| AI | 2 | Combustion Air Fan Speed | Modbus 30003 | Read | ||
| AI | 3 | Blower Motor Kw | Modbus 30005 | Read | ||
| AI | 4 | Boiler Efficiency | Modbus 30007 | Read | ||
| AImin | 5 | Firing Rate | Modbus 30009 | Read | ||
| AI | 6 | O2 Level | Modbus 30011 | Read | ||
| AImin | 7 | Set Point Steam Pressure/Water Temp | Modbus 30013 | Read | ||
| AI | 8 | Water Level | Modbus 30015 | Read | ||
| AImin | 9 | Steam Pressure or HW Temp | Modbus 30017 | Read | ||
| AI | 10 | Combustion Air Pressure | Modbus 30019 | Read | ||
| AI | 11 | Stack Temp Before Econ | Modbus 30021 | Read | ||
| AI | 12 | Combustion Air Temp | Modbus 30023 | Read | ||
| AI | 13 | Water Temp Shell/Outdoor Temp | Modbus 30025 | Read | ||
| AI | 14 | Feedwater Temp/Econ Water Out Temp | Modbus 30027 | Read | ||
| AI | 15 | Stack Temp After Econ/Return HW | Modbus 30029 | Read | ||
| AI | 16 | Economizer Water In Temp | Modbus 30031 | Read | ||
| AI | 17 | Analog Input User Defined #1 Input | Modbus 30033 | Read | ||
| AI | 18 | Analog Input User Defined #2 Input | Modbus 30035 | Read | ||
| AI | 19 | Analog Input User Defined #3 Input | Modbus 30037 | Read | ||
| AI | 20 | Analog Input User Defined #4 Input | Modbus 30039 | Read | ||
| AI | 21 | Safety Valve Setting or Max Water Temp | Modbus 30041 | Read | ||
| AI | 22 | Header Pressure or temp 2 Boiler LL | Modbus 30043 | Read | ||
| AI | 23 | Set Point 2 Boiler LL | Modbus 30045 | Read | ||
| AI | 24 | Boiler Off Point | Modbus 30047 | Read | ||
| AI | 25 | Boiler On Point | Modbus 30049 | Read | ||
| AI | 26 | AR[25] Future | Modbus 30051 | Read | ||
| AI | 27 | AR[26] Future | Modbus 30053 | Read | ||
| AImin | 28 | Brnr Control Status Line 1 Honeywell | Modbus 30055 | Read | ||
| AI | 29 | Brnr Control Status Line 2 Honeywell | Modbus 30056 | Read | ||
| AI | 30 | Brnr Control Status Line 1 Fireye | Modbus 30057 | Read | ||
| AI | 31 | Brnr Control Status Line 2 Fireye | Modbus 30058 | Read | ||
| AI | 32 | Flame Signal Fireye | Modbus 30059 | Read | ||
| AI | 33 | Fuel 1 Type | Modbus 30060 | Read | ||
| AI | 34 | Fuel 2 Type | Modbus 30061 | Read | ||
| AI | 35 | Fuel 3 Type | Modbus 30062 | Read | ||
| AI | 36 | Boiler ID | Modbus 30063 | Read | ||
| AI | 37 | Elapsed Time (First 16 Bits) | Modbus 30064 | Read | ||
| AI | 38 | Elapsed Time (Second 16 Bits) | Modbus 30065 | Read | ||
| AI | 39 | Number Of Cycles (First 16 Bits) | Modbus 30066 | Read | ||
| AI | 40 | Number Of Cycles (Second 16 Bits) | Modbus 30067 | Read | ||
| AI | 41 | AI[13] Future | Modbus 30068 | Read | ||
| AI | 42 | AI[14] Future | Modbus 30069 | Read | ||
| AI | 43 | Elapsed Time | Modbus 30070 | Read | ||
| AI | 44 | Number Of Cycles | Modbus 30072 | Read |
No points match these filters.
Object ID lookup: Cleaver-Brooks Hawk ICS boiler control point IDs by name
BI1Drive FaultBI2Modbus Com ErrorBI3Low WaterBI4BC AlarmBI5Boiler Limits OpenBI6High Stack Temp AlarmBI7High Stack Temp SDBI8External InterlockBI9I/O module faultBI10Steam Sensor FailBI11Air Drive out of Position AlarmBI12Gas Drive out of Position AlarmBI13F/A Ratio Controller FaultBI14No Fuel SelectedBI15Low Clogix BatteryBI16Non Recycle Limit Relay FailBI17Recyle Limit Relay FailBI18Remote Modulation Signal FailBI19Header Sensor FailBI20TC Channel FailBI21Low O2 AlarmBI22High Limit AlarmBI23ALWCOBI24Low Gas Pressure/Low Oil TempBI25High Gas Pressure/High Oil TempBI26Low Oil PressureBI27High Oil PressureBI28Oil Drawer Switch Not MadeBI29Low Atomizing Air PressureBI30Low Combustion Air PressureBI31AUX Alarm 1BI32AUX Alarm 2BI33Blower OnBI34Purge InputBI35Release To modulate InputBI36Low Fire SwitchBI37High Fire SwitchBI38Ready to start/Limits ClosedBI39External Start InterlockBI40ALFCOBI41PilotBI42Main Fuel Valve OpenBI43Fuel 1 SelectedBI44Fuel 2 SelectedBI45FSG AlarmBI46LWCO ShutdownBI47Remote enable inputBI48Burner SwitchBI49Recycle Limit RelayBI50External Device StartBI51Non Recycle Limit RelayBI52Drive to Low Fire (FARC)BI53Start Slave Blr (2 Blr LL)BI54Load Demand OutputBI55Alarm OutputBI56Boiler Ready (LL)BI57Boiler Load DemandBI58Firing Rate Remote/LlagBI59Firing Rate ManualBI60Firing Rate AutoBI61Hot Stand ByBI62Warm UpBI63Fuel 3 SelectedBI64Aux Alarm 3BI65Steam or Hot WaterBI66Level Master PresentBI67Variable Speed Drive PresentBI68Economizer PresentBI69Combustion Air Temp PresentBI70Oil Temp Sensor PresentBI71O2 Analyzer PresentBI72Feedwater or Return Temp PresentBI73Outdoor Reset SelectedBI74Parallel Positioning SelectedBI75Two boiler lead lag master selectBI76Two boiler lead lag slave selectBI77Master panel selectBI78Hot stand by selectBI79Dual setpoint selectBI80Gas Flow SelectBI81Oil Flow SelectBI82Steam Flow SelectBI83Water Flow SelectBI84Honeywell or FireyeBI85High Water AlarmBI86Oil Drive out of Position AlarmBI87FGR Drive out of Position AlarmBI88Air Actuator FB Alarm LowBI89Air Actuator FB Alarm HighBI90Fuel1 Actuator FB Alarm LowBI91Fuel1 Actuator FB Alarm HighBI92Fuel2 Actuator FB Alarm LowBI93Fuel2 Actuator FB Alarm HighBI94FGR Actuator FB Alarm LowBI95FGR Actuator FB Alarm HighBI96VSD Deviation AlarmAI1Flame Strength HoneywellAI2Combustion Air Fan SpeedAI3Blower Motor KwAI4Boiler EfficiencyAI5Firing RateAI6O2 LevelAI7Set Point Steam Pressure/Water TempAI8Water LevelAI9Steam Pressure or HW TempAI10Combustion Air PressureAI11Stack Temp Before EconAI12Combustion Air TempAI13Water Temp Shell/Outdoor TempAI14Feedwater Temp/Econ Water Out TempAI15Stack Temp After Econ/Return HWAI16Economizer Water In TempAI17Analog Input User Defined #1 InputAI18Analog Input User Defined #2 InputAI19Analog Input User Defined #3 InputAI20Analog Input User Defined #4 InputAI21Safety Valve Setting or Max Water TempAI22Header Pressure or temp 2 Boiler LLAI23Set Point 2 Boiler LLAI24Boiler Off PointAI25Boiler On PointAI26AR[25] FutureAI27AR[26] FutureAI28Brnr Control Status Line 1 HoneywellAI29Brnr Control Status Line 2 HoneywellAI30Brnr Control Status Line 1 FireyeAI31Brnr Control Status Line 2 FireyeAI32Flame Signal FireyeAI33Fuel 1 TypeAI34Fuel 2 TypeAI35Fuel 3 TypeAI36Boiler IDAI37Elapsed Time (First 16 Bits)AI38Elapsed Time (Second 16 Bits)AI39Number Of Cycles (First 16 Bits)AI40Number Of Cycles (Second 16 Bits)AI41AI[13] FutureAI42AI[14] FutureAI43Elapsed TimeAI44Number Of Cycles
Integration notes
- Each Cleaver-Brooks controller on the ProtoNode is its own BACnet device; the object instances below are the same on every device.
- The profile has only AI and BI objects and the guide marks none as write points, so all are read-only.
- The guide gives no engineering units or state texts; units appear only where the object name carries them (DEG F / DEG C).
- Where a description is filled in, it gives the register from the guide's Modbus column.
Check it against the live device. A points list tells you what the controller can expose; the unit in front of you may differ by firmware or installed options. This list is provided as-is for reference only and may contain mistakes — confirming it before you write, map or commission anything is up to you (terms). Easy BACnet scans a network for BACnet IP devices from an Android phone, reads every object on the Hawk ICS boiler control (ProtoNode) and exports what it actually has to Excel — free. New to BACnet? Start with what a BACnet points list is and what the object types mean.
Questions about the Cleaver-Brooks Hawk ICS boiler control (ProtoNode)
How many BACnet points does the Cleaver-Brooks Hawk ICS boiler control (ProtoNode) have?
This list has 140 BACnet objects: 44 analog inputs, 96 binary inputs. The exact set on a given unit depends on its firmware, installed options and configuration.
Which Cleaver-Brooks Hawk ICS boiler control (ProtoNode) BACnet points are writable?
None of the listed objects are marked writable in the source documentation.
Where is the official Cleaver-Brooks Hawk ICS boiler control (ProtoNode) BACnet documentation?
Cleaver-Brooks does not publish it on its own website. This list comes from Cloud Enabled ProtoNode Gateway Startup Guide (RER/LER) for interfacing Cleaver-Brooks products (750-426), revision 03/2018, a copy hosted by watmfg.com at https://watmfg.com/watmfg23082016/wp-content/uploads/2016/09/750-426-ProtoNode-Cloud.pdf. Ask Cleaver-Brooks or its representative for the current revision.
What are the minimum BACnet points to integrate the Cleaver-Brooks Hawk ICS boiler control (ProtoNode)?
Start with BI 57 Boiler Load Demand (Boiler load demand); BI 47 Remote enable input (Remote enable input); AI 9 Steam Pressure or HW Temp (Steam pressure or hot water temperature); AI 7 Set Point Steam Pressure/Water Temp (Active setpoint); AI 5 Firing Rate (Firing rate); BI 42 Main Fuel Valve Open (Main fuel valve open); BI 55 Alarm Output (Alarm output); AI 28 Brnr Control Status Line 1 Honeywell (Burner control status line 1 (Honeywell)).
How do I check these points on the real Hawk ICS boiler control (ProtoNode)?
Scan the network with a BACnet IP browser such as Easy BACnet, open the device and compare its object list with this table. Anything missing is usually an option that isn't installed or a point that is disabled in the controller's configuration.
More Cleaver-Brooks BACnet points lists
- Boiler feedwater deaerator and surge tank controller via BACnet gateway
Cleaver-Brooks ADAC 1000 deaerator / surge tank control (ProtoNode, EtherNet/IP)
Cleaver-Brooks deaerator and surge tank packages with the ADAC 1000 PLC control, read through a ProtoNode RER gateway over EtherNet/IP.
Also known as: ADAC 1000, ADAC_1000, ProtoNode RER, 750-426 - Boiler feedwater deaerator and surge tank controller via BACnet gateway
Cleaver-Brooks ADAC deaerator / surge tank control (ProtoNode)
Cleaver-Brooks deaerator and surge tank packages with the ADAC control, read through a ProtoNode RER gateway.
Also known as: ADAC, CB deaerator control, ProtoNode RER, 750-426 - Boiler flame safeguard via BACnet gateway
Cleaver-Brooks CB120 flame safeguard (ProtoNode)
Cleaver-Brooks boilers with the CB120 flame safeguard, read through a ProtoNode RER gateway.
Also known as: CB120, CB 120, ProtoNode RER, 750-426 - Boiler flame safeguard via BACnet gateway
Cleaver-Brooks CB780 flame safeguard with expanded annunciator (ProtoNode)
Cleaver-Brooks boilers with the CB780 burner management control and expanded annunciator, read through a ProtoNode RER gateway.
Also known as: CB780, CB 780, CB780E, ProtoNode RER, 750-426 - Hot water boiler control via BACnet gateway
Cleaver-Brooks Falcon Hydronic boiler control (ProtoNode)
Cleaver-Brooks hot water boilers with the Falcon hydronic burner control, read through a ProtoNode RER gateway.
Also known as: Falcon Hydronic, ClearFire Falcon, CB Falcon, ProtoNode RER, 750-426 - Steam boiler control via BACnet gateway
Cleaver-Brooks Falcon Steam boiler control (ProtoNode)
Cleaver-Brooks steam boilers with the Falcon steam burner control, read through a ProtoNode RER gateway.
Also known as: Falcon Steam, CB Falcon steam, ProtoNode RER, 750-426 - Boiler flame safeguard and fuel-air ratio control via BACnet gateway
Cleaver-Brooks FARC with CB780 / CB783 burner control (ProtoNode)
Cleaver-Brooks boilers with a CB780/CB783 burner control and FARC fuel-air ratio control, read through a ProtoNode RER gateway.
Also known as: FARC, CB 780/783, CB783, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk 1000 boiler control (ProtoNode)
Cleaver-Brooks boilers with the Hawk 1000 PLC boiler control, read through a ProtoNode RER gateway.
Also known as: Hawk 1000, CB Hawk 1000, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk 2000 boiler control (ProtoNode)
Cleaver-Brooks boilers with the Hawk 2000 control, read through a ProtoNode RER gateway.
Also known as: Hawk 2000, CB Hawk 2000, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk 4000 boiler control (ProtoNode)
Cleaver-Brooks boilers with the Hawk 4000 PLC boiler control, read through a ProtoNode RER gateway.
Also known as: Hawk 4000, CB Hawk 4000, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk 4000 V2 boiler control (ProtoNode)
Cleaver-Brooks boilers with the HAWK 4000 V2 PLC boiler control, read through a ProtoNode RER gateway.
Also known as: HAWK 4000 V2, CB HAWK 4000 V2, HAWK_4000_V2, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk 4500 boiler control (ProtoNode, EtherNet/IP)
Cleaver-Brooks boilers with the Hawk 4500 PLC boiler control, read through a ProtoNode RER gateway over EtherNet/IP.
Also known as: Hawk 4500, CB Hawk 4500, ProtoNode RER, 750-426 - Steam boiler control via BACnet gateway
Cleaver-Brooks Hawk 5000 boiler control (ProtoNode)
Cleaver-Brooks steam boilers with the Hawk 5000 control, read through a ProtoNode RER gateway.
Also known as: Hawk 5000, CB Hawk 5000, ProtoNode RER, 750-426 - Boiler lead/lag master panel via BACnet gateway
Cleaver-Brooks Hawk Master Panel lead/lag (ProtoNode)
Cleaver-Brooks Hawk Master Panels sequencing up to eight Hawk boilers (A-H), read through a ProtoNode RER gateway.
Also known as: Hawk Master Panel, Hawk Master, CB Master Panel, ProtoNode RER, 750-426 - Boiler interface module via BACnet gateway
Cleaver-Brooks HSC Boiler Interface Module (ProtoNode)
Cleaver-Brooks HSC boiler interface modules (one boiler each), read through a ProtoNode RER gateway.
Also known as: Boiler Interface Module, HSC Boiler Interface, BIM, ProtoNode RER, 750-426 - Multi-boiler sequencer (hot water boiler plant) via BACnet gateway
Cleaver-Brooks HSC Hydronic System Controller (ProtoNode)
Cleaver-Brooks HSC panels sequencing up to 10 condensing and 10 non-condensing boilers, read through a ProtoNode RER gateway.
Also known as: HSC, Hydronic System Controller, CB HSC, ProtoNode RER, 750-426 - Pump interface module (boiler plant pumps) via BACnet gateway
Cleaver-Brooks HSC Pump Interface Module (ProtoNode)
Cleaver-Brooks HSC pump interface modules (up to four system pumps), read through a ProtoNode RER gateway.
Also known as: Pump Interface Module, HSC Pump Interface, ProtoNode RER, 750-426 - Boiler water level controller via BACnet gateway
Cleaver-Brooks LCS Level Control System (ProtoNode)
Cleaver-Brooks LCS water level controllers (one or two tanks), read through a ProtoNode RER gateway.
Also known as: LCS, Level Control System, ProtoNode RER, 750-426 - Boiler feed pump controller via BACnet gateway
Cleaver-Brooks PCS Pump Control System (ProtoNode)
Cleaver-Brooks PCS pump controllers (up to four pumps on header pressure or tank level), read through a ProtoNode RER gateway.
Also known as: PCS, Pump Control System, ProtoNode RER, 750-426 - Electric power meter via BACnet gateway
Cleaver-Brooks Shark 100 power meter profile (ProtoNode)
Shark 100 power meters supplied on Cleaver-Brooks equipment, read through a ProtoNode RER gateway.
Also known as: Shark 100, Electro Industries Shark 100, ProtoNode RER, 750-426 - Electric power meter via BACnet gateway
Cleaver-Brooks Shark 200 power meter profile (ProtoNode)
Shark 200 power meters supplied on Cleaver-Brooks equipment, read through a ProtoNode RER gateway.
Also known as: Shark 200, Electro Industries Shark 200, ProtoNode RER, 750-426 - Process loop controller via BACnet gateway
Cleaver-Brooks UDC 2500 loop controller profile (ProtoNode)
Honeywell UDC 2500 loop controllers supplied on Cleaver-Brooks equipment, read through a ProtoNode RER gateway.
Also known as: UDC 2500, UDC2500, Honeywell UDC 2500, ProtoNode RER, 750-426
Source: Cloud Enabled ProtoNode Gateway Startup Guide (RER/LER) for interfacing Cleaver-Brooks products · 750-426 · rev. 03/2018. Object names, instances and units are reproduced as published; descriptions are our own.