- Home
- BACnet points lists
- Cleaver-Brooks
- Hawk 5000 boiler control (ProtoNode)
Steam boiler control via BACnet gateway · BACnet points list
Cleaver-Brooks Hawk 5000 boiler control (ProtoNode) BACnet points list
Updated 7 November 2026Unofficial source
A read-only ProtoNode profile for the Hawk 5000 control: burner sequence and limit inputs, transmitter bad-quality and high/low alarm bits, steam pressure, drum level, steam and feedwater flow, stack and economizer temperatures, O2, VSD data, actuator positions, setpoints and burner control status.
This page lists 266 BACnet objects for the Cleaver-Brooks Hawk 5000 boiler control (ProtoNode) — 0 of them writable — with each object’s type, instance number, name, engineering units and access. It is re-typed from a copy of Cleaver-Brooks’s documentation hosted by watmfg.com, not by Cleaver-Brooks itself, so treat it as unofficial.
- Manufacturer
- Cleaver-Brooks
- Model
- Hawk 5000 boiler control (ProtoNode)
- Equipment
- Steam boiler control via BACnet gateway
- Equipment type
- Boilers & water heaters
- BACnet objects
- 266 (0 writable)
- Transport
- BACnet MS/TP, BACnet IP
- Firmware
- Not stated
- Default device instance
- 50000 + Modbus Node-ID
- Also known as
- Hawk 5000, CB Hawk 5000, ProtoNode RER, 750-426
- Source document
- Cloud Enabled ProtoNode Gateway Startup Guide (RER/LER) for interfacing Cleaver-Brooks products · 750-426 · rev. 03/2018 (unofficial copy, hosted by watmfg.com)
Reference only, provided as-is: verify against Cleaver-Brooks’s current documentation and the live device before use. Not official Cleaver-Brooks information. Terms of use.
BMS integration notes: Cleaver-Brooks Hawk 5000 boiler control (ProtoNode)
Read-only. Map steam pressure and setpoint, drum level, firing rate, blower running and the burner control fault.
Minimum points to map
The short list most integrators start with — enough to run the unit from a BMS. Map more as the job needs.
| Object | Name | Why | Access |
|---|---|---|---|
| AI 1 | Steam Press | Steam pressure | Read |
| AI 17 | Steam Press SP | Steam pressure setpoint | Read |
| AI 2 | Drum Level | Drum level | Read |
| AI 23 | Firing Rate | Firing rate | Read |
| BI 1 | Comb Air Blower Running | Combustion air blower running | Read |
| BI 38 | Load Demand | Load demand | Read |
| BI 148 | Burner Control Fault Alm | Burner control fault alarm | Read |
| BI 14 | Lo Water Cutoff (LWCO) | Low water cutoff | Read |
Network setup
- BACnet Device Instance = the controller's Modbus Node-ID + Node_Offset (default 50,000), so Node-ID 1 = 50001. Change Node_Offset in the ProtoNode web configurator to pick other instances.
- The ProtoNode RER does BACnet MS/TP or BACnet IP, selected on its S bank DIP switches.
- BACnet MS/TP: one MAC address (1-127) for the whole ProtoNode on the A bank DIP switches; baud on B0-B3 (38400 factory default).
- BACnet IP: default ProtoNode address 192.168.1.24; change it in the web configurator.
Cleaver-Brooks Hawk 5000 boiler control (ProtoNode) BACnet objects
Type: AI, AO, AV, BI, BO, BV, MI/MO/MV (multi-state) · Access: Read read-only, Write writable, Command writable with a priority array.
| Description | States | |||||
|---|---|---|---|---|---|---|
| BImin | 1 | Comb Air Blower Running | Read | |||
| BI | 2 | FSG Purge Cmd | Read | |||
| BI | 3 | FSG Release To Modulate Cmd | Read | |||
| BI | 4 | Actuators At Lo Fire | Read | |||
| BI | 5 | Actuators At Hi Fire | Read | |||
| BI | 6 | Ready To Start/ Limits Closed | Read | |||
| BI | 7 | Ext. Start Interlock Proven | Read | |||
| BI | 8 | ALFCO | Read | |||
| BI | 9 | FSG Pilot Terminal Energized | Read | |||
| BI | 10 | FSG Main Fuel Terminal Energized | Read | |||
| BI | 11 | Fuel Selector Switch - Fuel 1 Pos | Read | |||
| BI | 12 | Fuel Selector Switch - Fuel 2 Pos | Read | |||
| BI | 13 | FSG Burner Control Com Alm | Read | |||
| BImin | 14 | Lo Water Cutoff (LWCO) | Read | |||
| BI | 15 | FSG Lo Fire Cmd | Read | |||
| BI | 16 | Burner Start Relay Energized | Read | |||
| BI | 17 | Hi Water Cutoff (HWCO) | Read | |||
| BI | 18 | Yokagawa O2 Analyzer Ready Status | Read | |||
| BI | 19 | VSD Bypass Switch - Bypass Pos | Read | |||
| BI | 20 | Hi Steam Press Switch | Read | |||
| BI | 21 | Aux Lo Water Cutoff (ALWCO) | Read | |||
| BI | 22 | Lo Gas Press/Oil Temp Switch (LGP/LOT) | Read | |||
| BI | 23 | Hi Gas Press/Oil Temp Switch (HGP/HOT) | Read | |||
| BI | 24 | Lo Oil Press (LOP) | Read | |||
| BI | 25 | Hi Oil Press (HOP) | Read | |||
| BI | 26 | Atomizing Media Flo and Press Switches | Read | |||
| BI | 27 | Lo Water Alm | Read | |||
| BI | 28 | Comb Air Press Switch | Read | |||
| BI | 29 | Hi Water Alm | Read | |||
| BI | 30 | Hi Stack/ Furnace Press Switch | Read | |||
| BI | 31 | Lo Inst Air Press Switch | Read | |||
| BI | 32 | Oil Gun Inserted Limit Switch | Read | |||
| BI | 33 | Recycle Limit Relay | Read | |||
| BI | 34 | Ext. Device Start Interlock | Read | |||
| BI | 35 | Non-Recycle Limit Relay | Read | |||
| BI | 36 | Proof Of Lo Fire | Read | |||
| BI | 37 | Proof Of Hi Fire | Read | |||
| BImin | 38 | Load Demand | Read | |||
| BI | 39 | Alm Bell Relay | Read | |||
| BI | 40 | Boiler Ready | Read | |||
| BI | 41 | AB[2].8 | Read | |||
| BI | 42 | AB[2].9 | Read | |||
| BI | 43 | AB[2].10 | Read | |||
| BI | 44 | AB[2].11 | Read | |||
| BI | 45 | AB[2].12 | Read | |||
| BI | 46 | AB[2].13 | Read | |||
| BI | 47 | AB[2].14 | Read | |||
| BI | 48 | AB[2].15 | Read | |||
| BI | 49 | Bad Ql- Steam Press (06:00) | Read | |||
| BI | 50 | Bad Ql- Drum Level (06:01) | Read | |||
| BI | 51 | Bad Ql- Stack Temp (06:02) | Read | |||
| BI | 52 | Bad Ql- Remote Modulation (06:03) | Read | |||
| BI | 53 | Bad Ql- Steam Flo (06:04) | Read | |||
| BI | 54 | Bad Ql- Mud Drm Shell Tmp (06:05) | Read | |||
| BI | 55 | Bad Ql- Act5 (VSD) FB (06:06) | Read | |||
| BI | 56 | Bad Ql- Flue Gas O2 (06:07) | Read | |||
| BI | 57 | Bad Ql- F1 Flo or Usr Def (07:00) | Read | |||
| BI | 58 | Bad Ql- F2 Flo or Usr Def (07:01) | Read | |||
| BI | 59 | Bad Ql- Stack Draft or Usr Def (07:02) | Read | |||
| BI | 60 | Bad Ql- Feedwtr Flo or Usr Def (07:03) | Read | |||
| BI | 61 | Bad Ql- Ecn Out FG Tmp -Usr Def (07:04 | Read | |||
| BI | 62 | Bad Ql- Ecn In FW Tmp - Usr Def (07:05 | Read | |||
| BI | 63 | Bad Ql- Ecn Out FW Tmp -Usr Def (07:06 | Read | |||
| BI | 64 | Bad Ql- Air Flo or Usr Def (07:07) | Read | |||
| BI | 65 | Bad Ql- Actuator1 (Air) FB (09:00) | Read | |||
| BI | 66 | Bad Ql- Actuator2 (F1) FB (09:01) | Read | |||
| BI | 67 | Bad Ql- Actuator3 (F2) FB (09:02) | Read | |||
| BI | 68 | Bad Ql- Actuator (FGR) FB (09:03) | Read | |||
| BI | 69 | Bad Ql- Actuator8 (2nd Air) FB (09:04) | Read | |||
| BI | 70 | Bad Ql- Actuator9 (2nd F1) FB (09:05) | Read | |||
| BI | 71 | Bad Ql- Reserved (09:06) | Read | |||
| BI | 72 | Bad Ql- Reserved (09:07) | Read | |||
| BI | 73 | HAlm - Steam Press (Xmtr) | Read | |||
| BI | 74 | HAlm - Drum Level (xmtr) | Read | |||
| BI | 75 | HAlm - Stack Temp (Xmtr) | Read | |||
| BI | 76 | HAlm - Remote Modulation Input | Read | |||
| BI | 77 | HAlm - Steam Flo (Xmtr) | Read | |||
| BI | 78 | HAlm - Mud Drum Shell Temp (Xmtr) | Read | |||
| BI | 79 | HAlm - VSD Speed Feedback (Xmtr) | Read | |||
| BI | 80 | HAlm - Flue Gas O2 (Xmtr) | Read | |||
| BI | 81 | HAlm - F1 Flo (Xmtr) | Read | |||
| BI | 82 | HAlm - F2 Flo (Xmtr) | Read | |||
| BI | 83 | HAlm - Stack Draft (Xmtr) | Read | |||
| BI | 84 | HAlm - Feedwater Flo (Xmtr) | Read | |||
| BI | 85 | HAlm - Econ Outlet FG Temp (Xmtr) | Read | |||
| BI | 86 | HAlm - Econ Inlet FW Temp (Xmtr) | Read | |||
| BI | 87 | HAlm - Econ Outlet FW Temp (Xmtr) | Read | |||
| BI | 88 | HAlm - Air Flo Hi (Xmtr) | Read | |||
| BI | 89 | HHAlm - Stack Tmp Hi-Hi SHUTDWN (Xmtr) | Read | |||
| BI | 90 | HAlm - Hi Water Cutoff (Contact) | Read | |||
| BI | 91 | HAlm - Hi Gas Pressure (Contact) | Read | |||
| BI | 92 | HAlm - Hi Oil Temp (Contact) | Read | |||
| BI | 93 | HAlm - Hi Oil Pressure (Contact) | Read | |||
| BI | 94 | HAlm - Hi Water Alm (Contact) | Read | |||
| BI | 95 | HHAlm - Hi-Hi Furn Press SHTDWN | Read | |||
| BI | 96 | Reserved | Read | |||
| BI | 97 | LAlm - Steam Press (Xmtr) | Read | |||
| BI | 98 | LAlm - Drum Level (Xmtr) | Read | |||
| BI | 99 | LAlm - Stack Temp (Xmtr) | Read | |||
| BI | 100 | LAlm - Remote Modulation | Read | |||
| BI | 101 | LAlm - Steam Flo (Xmtr) | Read | |||
| BI | 102 | LAlm - Mud Drum Shell Temp (Xmtr) | Read | |||
| BI | 103 | LAlm - VSD Speed Feedback | Read | |||
| BI | 104 | LAlm - Flo Gas O2 (Xmtr) | Read | |||
| BI | 105 | LAlm - F1 Flo (Xmtr) | Read | |||
| BI | 106 | LAlm - F2 Flo (Xmtr) | Read | |||
| BI | 107 | LAlm - Stack Draft (Xmtr) | Read | |||
| BI | 108 | LAlm - Feedwtr Flo (Xmtr) | Read | |||
| BI | 109 | LAlm - Econ Outlet FG Temp (Xmtr) | Read | |||
| BI | 110 | LAlm - Econ Inlet Feedwtr Temp (Xmtr) | Read | |||
| BI | 111 | LAlm - Econ Outlet Feedwtr Temp (Xmtr) | Read | |||
| BI | 112 | LAlm - Air Flo (Xmtr) | Read | |||
| BI | 113 | LAlm - Lo wtr Cutoff (Contact) | Read | |||
| BI | 114 | LAlm - Aux Lo wtr Cutoff (Contact) | Read | |||
| BI | 115 | LAlm - Lo Gas Press (Contact) | Read | |||
| BI | 116 | LAlm - Lo Oil Temp (Contact) | Read | |||
| BI | 117 | LAlm - Lo Oil Press (Contact) | Read | |||
| BI | 118 | LAlm - Lo wtr Alm (Contact) | Read | |||
| BI | 119 | LAlm - Lo Comb Air Press (Contact) | Read | |||
| BI | 120 | LAlm - Lo Inst Air Press (Contact) | Read | |||
| BI | 121 | LLAlm - Flo Gas O2 Lo-Lo SHUTDOWN | Read | |||
| BI | 122 | AB[7].9 | Read | |||
| BI | 123 | AB[7].10 | Read | |||
| BI | 124 | AB[7].11 | Read | |||
| BI | 125 | AB[7].12 | Read | |||
| BI | 126 | AB[7].13 | Read | |||
| BI | 127 | AB[7].14 | Read | |||
| BI | 128 | AB[7].15 | Read | |||
| BI | 129 | Burner Control Alm (Contact) | Read | |||
| BI | 130 | Yokagawa O2 Analyzer Not Ready | Read | |||
| BI | 131 | Lo Atomizing Media (Contact) | Read | |||
| BI | 132 | Oil Gun Pos Switch Not Made (Contact) | Read | |||
| BI | 133 | Recycle Limit Relay (RLR) Fault | Read | |||
| BI | 134 | Non-Recycle Limit Relay (NRLR) Fault | Read | |||
| BI | 135 | Actuator1 (Air) Out Of Pos Alm | Read | |||
| BI | 136 | Actuator2 (F1) Out Of Pos Alm | Read | |||
| BI | 137 | Actuator3 (F2) Out Of Pos Alm | Read | |||
| BI | 138 | Actuator (FGR) Out Of Pos Alm | Read | |||
| BI | 139 | Act1 (Air) Feedback Outside Cal Rng | Read | |||
| BI | 140 | Act2 (F1) Feedback Outside Cal Rng | Read | |||
| BI | 141 | Act3 (F2) Feedback Outside Cal Rng | Read | |||
| BI | 142 | Actu (FGR) Feedback Outside Cal Rng | Read | |||
| BI | 143 | Ext. Start Interlock Not Closed Alm | Read | |||
| BI | 144 | Actuator5 (VSD) FB / CVDeviation Alm | Read | |||
| BI | 145 | A-B VSD Fault Alm | Read | |||
| BI | 146 | Modbus Comm Error | Read | |||
| BI | 147 | I/O Module ## Fault Detected Alm | Read | |||
| BImin | 148 | Burner Control Fault Alm | Read | |||
| BI | 149 | Hi Limit Cutoff Alm | Read | |||
| BI | 150 | CPU Battery Alm | Read | |||
| BI | 151 | Actuator8 (2nd Air) Out Of Pos Alm | Read | |||
| BI | 152 | Actuator9 (2nd F1) Out Of Pos Alm | Read | |||
| BI | 153 | Actuator8 (2nd Air) FB Outside Cal Rng | Read | |||
| BI | 154 | Actuator9 (2nd F1) FB Outside Cal Rng | Read | |||
| BI | 155 | Reserved | Read | |||
| BI | 156 | Reserved | Read | |||
| BI | 157 | Reserved | Read | |||
| BI | 158 | No Fuel Selected | Read | |||
| BI | 159 | EIP Comm Link FAULT - Master Panel | Read | |||
| BI | 160 | Reserved | Read | |||
| BI | 161 | HAlm - Usr Def (07:00) | Read | |||
| BI | 162 | HAlm - Usr Def (07:01) | Read | |||
| BI | 163 | HAlm - Usr Def (07:02) | Read | |||
| BI | 164 | HAlm - Usr Def (07:03) | Read | |||
| BI | 165 | HAlm - Usr Def (07:04) | Read | |||
| BI | 166 | HAlm - Usr Def (07:05) | Read | |||
| BI | 167 | HAlm - Usr Def (07:06) | Read | |||
| BI | 168 | HAlm - Usr Def (07:07) | Read | |||
| BI | 169 | Input Bad Quality - Usr Def (07:00) | Read | |||
| BI | 170 | Input Bad Quality - Usr Def (07:01) | Read | |||
| BI | 171 | Input Bad Quality - Usr Def (07:02) | Read | |||
| BI | 172 | Input Bad Quality - Usr Def (07:03) | Read | |||
| BI | 173 | Input Bad Quality - Usr Def (07:04) | Read | |||
| BI | 174 | Input Bad Quality - Usr Def (07:05) | Read | |||
| BI | 175 | Input Bad Quality - Usr Def (07:06) | Read | |||
| BI | 176 | Input Bad Quality - Usr Def (07:07) | Read | |||
| BI | 177 | LAlm - Usr Def (07:00) | Read | |||
| BI | 178 | LAlm - Usr Def (07:01) | Read | |||
| BI | 179 | LAlm - Usr Def (07:02) | Read | |||
| BI | 180 | LAlm - Usr Def (07:03) | Read | |||
| BI | 181 | LAlm - Usr Def (07:04) | Read | |||
| BI | 182 | LAlm - Usr Def (07:05) | Read | |||
| BI | 183 | LAlm - Usr Def (07:06) | Read | |||
| BI | 184 | LAlm - Usr Def (07:07) | Read | |||
| BI | 185 | Reserved | Read | |||
| BI | 186 | Reserved | Read | |||
| BI | 187 | Reserved | Read | |||
| BI | 188 | Reserved | Read | |||
| BI | 189 | Reserved | Read | |||
| BI | 190 | Reserved | Read | |||
| BI | 191 | Reserved | Read | |||
| BI | 192 | Reserved | Read | |||
| AImin | 1 | Steam Press | Modbus 30001 | Read | ||
| AImin | 2 | Drum Level | Modbus 30003 | Read | ||
| AI | 3 | Stack Temp | Modbus 30005 | Read | ||
| AI | 4 | Remote Modulation | Modbus 30007 | Read | ||
| AI | 5 | Steam Flo | Modbus 30009 | Read | ||
| AI | 6 | Mud Drum Shell Temp | Modbus 30011 | Read | ||
| AI | 7 | VSD Speed Feedback | Modbus 30013 | Read | ||
| AI | 8 | Flue Gas O2 | Modbus 30015 | Read | ||
| AI | 9 | F1 Flo or Usr Def | Modbus 30017 | Read | ||
| AI | 10 | F2 Flo or Usr Def | Modbus 30019 | Read | ||
| AI | 11 | Stack Draft or Usr Def | Modbus 30021 | Read | ||
| AI | 12 | Feedwtr Flo or Usr Def | Modbus 30023 | Read | ||
| AI | 13 | Econ Outlet FG Temp or Usr Def | Modbus 30025 | Read | ||
| AI | 14 | Econ Inlet FW Temp or Usr Def | Modbus 30027 | Read | ||
| AI | 15 | Econ Outlet FW Temp or Usr Def | Modbus 30029 | Read | ||
| AI | 16 | Air Flo or Usr Def | Modbus 30031 | Read | ||
| AImin | 17 | Steam Press SP | Modbus 30033 | Read | ||
| AI | 18 | Drum Level SP | Modbus 30035 | Read | ||
| AI | 19 | Flue Gas O2 SP | Modbus 30037 | Read | ||
| AI | 20 | Boiler Effiiciency | Modbus 30039 | Read | ||
| AI | 21 | VSD Motor KW | Modbus 30041 | Read | ||
| AI | 22 | VSD Motor Current | Modbus 30043 | Read | ||
| AImin | 23 | Firing Rate | Modbus 30045 | Read | ||
| AI | 24 | Drum Level % | Modbus 30047 | Read | ||
| AI | 25 | Jackshaft Actuator (Pct) | Modbus 30049 | Read | ||
| AI | 26 | Actuator7 (Feedwtr Valve) (Pct) | Modbus 30051 | Read | ||
| AI | 27 | Actuator5 (VSD) (Pct) | Modbus 30053 | Read | ||
| AI | 28 | Actuator6 (Outlet Damper) (Pct) | Modbus 30055 | Read | ||
| AI | 29 | Actuator1 (Air) CV (POSP_SP) | Modbus 30057 | Read | ||
| AI | 30 | Actuator2 (F1) CV (POSP_SP) | Modbus 30059 | Read | ||
| AI | 31 | Actuator3 (F2) CV (POSP_SP) | Modbus 30061 | Read | ||
| AI | 32 | Actuator4 (FGR) CV (POSP_ SP) | Modbus 30063 | Read | ||
| AI | 33 | VSD Speed (Hz) | Modbus 30065 | Read | ||
| AI | 34 | Boiler Number Derrived From IP Address | Modbus 30067 | Read | ||
| AI | 35 | Reserved | Modbus 30069 | Read | ||
| AI | 36 | Reserved | Modbus 30071 | Read | ||
| AI | 37 | Reserved | Modbus 30073 | Read | ||
| AI | 38 | Reserved | Modbus 30075 | Read | ||
| AI | 39 | Reserved | Modbus 30077 | Read | ||
| AI | 40 | Reserved | Modbus 30079 | Read | ||
| AI | 41 | Elapsed Time | Modbus 30081 | Read | ||
| AI | 42 | Number Of Cycles | Modbus 30082 | Read | ||
| AI | 43 | Steam Press (06:00) | Modbus 30083 | Read | ||
| AI | 44 | Drum Level (06:01) | Modbus 30084 | Read | ||
| AI | 45 | Stack Temp (06:02) | Modbus 30085 | Read | ||
| AI | 46 | Remote Modulation (06:03) | Modbus 30086 | Read | ||
| AI | 47 | Steam Flo (06:04) | Modbus 30087 | Read | ||
| AI | 48 | Mud Drum Shell Temp (06:05) | Modbus 30088 | Read | ||
| AI | 49 | Actuator5 (VSD) FB (06:06) | Modbus 30089 | Read | ||
| AI | 50 | Flue Gas O2 (06:07) | Modbus 30090 | Read | ||
| AI | 51 | F1 Flo or Usr Def (07:00) | Modbus 30091 | Read | ||
| AI | 52 | F2 Flo or Usr Def (07:01) | Modbus 30092 | Read | ||
| AI | 53 | Stack Draft or Usr Def (07:02) | Modbus 30093 | Read | ||
| AI | 54 | Feedwtr Flo or Usr Def (07:03) | Modbus 30094 | Read | ||
| AI | 55 | Econ Outlet FG Temp or Usr Def (07:04) | Modbus 30095 | Read | ||
| AI | 56 | Econ Inlet FW Temp or Usr Def (07:05) | Modbus 30096 | Read | ||
| AI | 57 | Econ Outlet FW Temp or Usr Def (07:06) | Modbus 30097 | Read | ||
| AI | 58 | Air Flo or Usr Def (07:07) | Modbus 30098 | Read | ||
| AI | 59 | Alm Tickler State Register | Modbus 30099 | Read | ||
| AI | 60 | Fuel 1 Type | Modbus 30100 | Read | ||
| AI | 61 | Fuel 2 Type | Modbus 30101 | Read | ||
| AI | 62 | Flame Strength - CB120 | Modbus 30102 | Read | ||
| AI | 63 | Flame Strength - CB780 | Modbus 30103 | Read | ||
| AI | 64 | Main Flame Flicker | Modbus 30104 | Read | ||
| AI | 65 | Reserved | Modbus 30105 | Read | ||
| AI | 66 | Reserved | Modbus 30106 | Read | ||
| AI | 67 | Burner Control Status Line 00 | Modbus 30107 | Read | ||
| AI | 68 | Burner Control Diagnostics 05 | Modbus 30108 | Read | ||
| AI | 69 | Failed I/O Module Number | Modbus 30109 | Read | ||
| AI | 70 | IP Address 00 | Modbus 30110 | Read | ||
| AI | 71 | IP Address 01 | Modbus 30111 | Read | ||
| AI | 72 | IP Address 02 | Modbus 30112 | Read | ||
| AI | 73 | IP Address 03 | Modbus 30113 | Read | ||
| AI | 74 | IP Address 04 | Modbus 30114 | Read |
No points match these filters.
Object ID lookup: Cleaver-Brooks Hawk 5000 boiler control point IDs by name
BI1Comb Air Blower RunningBI2FSG Purge CmdBI3FSG Release To Modulate CmdBI4Actuators At Lo FireBI5Actuators At Hi FireBI6Ready To Start/ Limits ClosedBI7Ext. Start Interlock ProvenBI8ALFCOBI9FSG Pilot Terminal EnergizedBI10FSG Main Fuel Terminal EnergizedBI11Fuel Selector Switch - Fuel 1 PosBI12Fuel Selector Switch - Fuel 2 PosBI13FSG Burner Control Com AlmBI14Lo Water Cutoff (LWCO)BI15FSG Lo Fire CmdBI16Burner Start Relay EnergizedBI17Hi Water Cutoff (HWCO)BI18Yokagawa O2 Analyzer Ready StatusBI19VSD Bypass Switch - Bypass PosBI20Hi Steam Press SwitchBI21Aux Lo Water Cutoff (ALWCO)BI22Lo Gas Press/Oil Temp Switch (LGP/LOT)BI23Hi Gas Press/Oil Temp Switch (HGP/HOT)BI24Lo Oil Press (LOP)BI25Hi Oil Press (HOP)BI26Atomizing Media Flo and Press SwitchesBI27Lo Water AlmBI28Comb Air Press SwitchBI29Hi Water AlmBI30Hi Stack/ Furnace Press SwitchBI31Lo Inst Air Press SwitchBI32Oil Gun Inserted Limit SwitchBI33Recycle Limit RelayBI34Ext. Device Start InterlockBI35Non-Recycle Limit RelayBI36Proof Of Lo FireBI37Proof Of Hi FireBI38Load DemandBI39Alm Bell RelayBI40Boiler ReadyBI41AB[2].8BI42AB[2].9BI43AB[2].10BI44AB[2].11BI45AB[2].12BI46AB[2].13BI47AB[2].14BI48AB[2].15BI49Bad Ql- Steam Press (06:00)BI50Bad Ql- Drum Level (06:01)BI51Bad Ql- Stack Temp (06:02)BI52Bad Ql- Remote Modulation (06:03)BI53Bad Ql- Steam Flo (06:04)BI54Bad Ql- Mud Drm Shell Tmp (06:05)BI55Bad Ql- Act5 (VSD) FB (06:06)BI56Bad Ql- Flue Gas O2 (06:07)BI57Bad Ql- F1 Flo or Usr Def (07:00)BI58Bad Ql- F2 Flo or Usr Def (07:01)BI59Bad Ql- Stack Draft or Usr Def (07:02)BI60Bad Ql- Feedwtr Flo or Usr Def (07:03)BI61Bad Ql- Ecn Out FG Tmp -Usr Def (07:04BI62Bad Ql- Ecn In FW Tmp - Usr Def (07:05BI63Bad Ql- Ecn Out FW Tmp -Usr Def (07:06BI64Bad Ql- Air Flo or Usr Def (07:07)BI65Bad Ql- Actuator1 (Air) FB (09:00)BI66Bad Ql- Actuator2 (F1) FB (09:01)BI67Bad Ql- Actuator3 (F2) FB (09:02)BI68Bad Ql- Actuator (FGR) FB (09:03)BI69Bad Ql- Actuator8 (2nd Air) FB (09:04)BI70Bad Ql- Actuator9 (2nd F1) FB (09:05)BI71Bad Ql- Reserved (09:06)BI72Bad Ql- Reserved (09:07)BI73HAlm - Steam Press (Xmtr)BI74HAlm - Drum Level (xmtr)BI75HAlm - Stack Temp (Xmtr)BI76HAlm - Remote Modulation InputBI77HAlm - Steam Flo (Xmtr)BI78HAlm - Mud Drum Shell Temp (Xmtr)BI79HAlm - VSD Speed Feedback (Xmtr)BI80HAlm - Flue Gas O2 (Xmtr)BI81HAlm - F1 Flo (Xmtr)BI82HAlm - F2 Flo (Xmtr)BI83HAlm - Stack Draft (Xmtr)BI84HAlm - Feedwater Flo (Xmtr)BI85HAlm - Econ Outlet FG Temp (Xmtr)BI86HAlm - Econ Inlet FW Temp (Xmtr)BI87HAlm - Econ Outlet FW Temp (Xmtr)BI88HAlm - Air Flo Hi (Xmtr)BI89HHAlm - Stack Tmp Hi-Hi SHUTDWN (Xmtr)BI90HAlm - Hi Water Cutoff (Contact)BI91HAlm - Hi Gas Pressure (Contact)BI92HAlm - Hi Oil Temp (Contact)BI93HAlm - Hi Oil Pressure (Contact)BI94HAlm - Hi Water Alm (Contact)BI95HHAlm - Hi-Hi Furn Press SHTDWNBI96ReservedBI97LAlm - Steam Press (Xmtr)BI98LAlm - Drum Level (Xmtr)BI99LAlm - Stack Temp (Xmtr)BI100LAlm - Remote ModulationBI101LAlm - Steam Flo (Xmtr)BI102LAlm - Mud Drum Shell Temp (Xmtr)BI103LAlm - VSD Speed FeedbackBI104LAlm - Flo Gas O2 (Xmtr)BI105LAlm - F1 Flo (Xmtr)BI106LAlm - F2 Flo (Xmtr)BI107LAlm - Stack Draft (Xmtr)BI108LAlm - Feedwtr Flo (Xmtr)BI109LAlm - Econ Outlet FG Temp (Xmtr)BI110LAlm - Econ Inlet Feedwtr Temp (Xmtr)BI111LAlm - Econ Outlet Feedwtr Temp (Xmtr)BI112LAlm - Air Flo (Xmtr)BI113LAlm - Lo wtr Cutoff (Contact)BI114LAlm - Aux Lo wtr Cutoff (Contact)BI115LAlm - Lo Gas Press (Contact)BI116LAlm - Lo Oil Temp (Contact)BI117LAlm - Lo Oil Press (Contact)BI118LAlm - Lo wtr Alm (Contact)BI119LAlm - Lo Comb Air Press (Contact)BI120LAlm - Lo Inst Air Press (Contact)BI121LLAlm - Flo Gas O2 Lo-Lo SHUTDOWNBI122AB[7].9BI123AB[7].10BI124AB[7].11BI125AB[7].12BI126AB[7].13BI127AB[7].14BI128AB[7].15BI129Burner Control Alm (Contact)BI130Yokagawa O2 Analyzer Not ReadyBI131Lo Atomizing Media (Contact)BI132Oil Gun Pos Switch Not Made (Contact)BI133Recycle Limit Relay (RLR) FaultBI134Non-Recycle Limit Relay (NRLR) FaultBI135Actuator1 (Air) Out Of Pos AlmBI136Actuator2 (F1) Out Of Pos AlmBI137Actuator3 (F2) Out Of Pos AlmBI138Actuator (FGR) Out Of Pos AlmBI139Act1 (Air) Feedback Outside Cal RngBI140Act2 (F1) Feedback Outside Cal RngBI141Act3 (F2) Feedback Outside Cal RngBI142Actu (FGR) Feedback Outside Cal RngBI143Ext. Start Interlock Not Closed AlmBI144Actuator5 (VSD) FB / CVDeviation AlmBI145A-B VSD Fault AlmBI146Modbus Comm ErrorBI147I/O Module ## Fault Detected AlmBI148Burner Control Fault AlmBI149Hi Limit Cutoff AlmBI150CPU Battery AlmBI151Actuator8 (2nd Air) Out Of Pos AlmBI152Actuator9 (2nd F1) Out Of Pos AlmBI153Actuator8 (2nd Air) FB Outside Cal RngBI154Actuator9 (2nd F1) FB Outside Cal RngBI155ReservedBI156ReservedBI157ReservedBI158No Fuel SelectedBI159EIP Comm Link FAULT - Master PanelBI160ReservedBI161HAlm - Usr Def (07:00)BI162HAlm - Usr Def (07:01)BI163HAlm - Usr Def (07:02)BI164HAlm - Usr Def (07:03)BI165HAlm - Usr Def (07:04)BI166HAlm - Usr Def (07:05)BI167HAlm - Usr Def (07:06)BI168HAlm - Usr Def (07:07)BI169Input Bad Quality - Usr Def (07:00)BI170Input Bad Quality - Usr Def (07:01)BI171Input Bad Quality - Usr Def (07:02)BI172Input Bad Quality - Usr Def (07:03)BI173Input Bad Quality - Usr Def (07:04)BI174Input Bad Quality - Usr Def (07:05)BI175Input Bad Quality - Usr Def (07:06)BI176Input Bad Quality - Usr Def (07:07)BI177LAlm - Usr Def (07:00)BI178LAlm - Usr Def (07:01)BI179LAlm - Usr Def (07:02)BI180LAlm - Usr Def (07:03)BI181LAlm - Usr Def (07:04)BI182LAlm - Usr Def (07:05)BI183LAlm - Usr Def (07:06)BI184LAlm - Usr Def (07:07)BI185ReservedBI186ReservedBI187ReservedBI188ReservedBI189ReservedBI190ReservedBI191ReservedBI192ReservedAI1Steam PressAI2Drum LevelAI3Stack TempAI4Remote ModulationAI5Steam FloAI6Mud Drum Shell TempAI7VSD Speed FeedbackAI8Flue Gas O2AI9F1 Flo or Usr DefAI10F2 Flo or Usr DefAI11Stack Draft or Usr DefAI12Feedwtr Flo or Usr DefAI13Econ Outlet FG Temp or Usr DefAI14Econ Inlet FW Temp or Usr DefAI15Econ Outlet FW Temp or Usr DefAI16Air Flo or Usr DefAI17Steam Press SPAI18Drum Level SPAI19Flue Gas O2 SPAI20Boiler EffiiciencyAI21VSD Motor KWAI22VSD Motor CurrentAI23Firing RateAI24Drum Level %AI25Jackshaft Actuator (Pct)AI26Actuator7 (Feedwtr Valve) (Pct)AI27Actuator5 (VSD) (Pct)AI28Actuator6 (Outlet Damper) (Pct)AI29Actuator1 (Air) CV (POSP_SP)AI30Actuator2 (F1) CV (POSP_SP)AI31Actuator3 (F2) CV (POSP_SP)AI32Actuator4 (FGR) CV (POSP_ SP)AI33VSD Speed (Hz)AI34Boiler Number Derrived From IP AddressAI35ReservedAI36ReservedAI37ReservedAI38ReservedAI39ReservedAI40ReservedAI41Elapsed TimeAI42Number Of CyclesAI43Steam Press (06:00)AI44Drum Level (06:01)AI45Stack Temp (06:02)AI46Remote Modulation (06:03)AI47Steam Flo (06:04)AI48Mud Drum Shell Temp (06:05)AI49Actuator5 (VSD) FB (06:06)AI50Flue Gas O2 (06:07)AI51F1 Flo or Usr Def (07:00)AI52F2 Flo or Usr Def (07:01)AI53Stack Draft or Usr Def (07:02)AI54Feedwtr Flo or Usr Def (07:03)AI55Econ Outlet FG Temp or Usr Def (07:04)AI56Econ Inlet FW Temp or Usr Def (07:05)AI57Econ Outlet FW Temp or Usr Def (07:06)AI58Air Flo or Usr Def (07:07)AI59Alm Tickler State RegisterAI60Fuel 1 TypeAI61Fuel 2 TypeAI62Flame Strength - CB120AI63Flame Strength - CB780AI64Main Flame FlickerAI65ReservedAI66ReservedAI67Burner Control Status Line 00AI68Burner Control Diagnostics 05AI69Failed I/O Module NumberAI70IP Address 00AI71IP Address 01AI72IP Address 02AI73IP Address 03AI74IP Address 04
Integration notes
- Each Cleaver-Brooks controller on the ProtoNode is its own BACnet device; the object instances below are the same on every device.
- The profile has only AI and BI objects and the guide marks none as write points, so all are read-only.
- The guide gives no engineering units or state texts; units appear only where the object name carries them (DEG F / DEG C).
- Where a description is filled in, it gives the register from the guide's Modbus column.
Check it against the live device. A points list tells you what the controller can expose; the unit in front of you may differ by firmware or installed options. This list is provided as-is for reference only and may contain mistakes — confirming it before you write, map or commission anything is up to you (terms). Easy BACnet scans a network for BACnet IP devices from an Android phone, reads every object on the Hawk 5000 boiler control (ProtoNode) and exports what it actually has to Excel — free. New to BACnet? Start with what a BACnet points list is and what the object types mean.
Questions about the Cleaver-Brooks Hawk 5000 boiler control (ProtoNode)
How many BACnet points does the Cleaver-Brooks Hawk 5000 boiler control (ProtoNode) have?
This list has 266 BACnet objects: 74 analog inputs, 192 binary inputs. The exact set on a given unit depends on its firmware, installed options and configuration.
Which Cleaver-Brooks Hawk 5000 boiler control (ProtoNode) BACnet points are writable?
None of the listed objects are marked writable in the source documentation.
Where is the official Cleaver-Brooks Hawk 5000 boiler control (ProtoNode) BACnet documentation?
Cleaver-Brooks does not publish it on its own website. This list comes from Cloud Enabled ProtoNode Gateway Startup Guide (RER/LER) for interfacing Cleaver-Brooks products (750-426), revision 03/2018, a copy hosted by watmfg.com at https://watmfg.com/watmfg23082016/wp-content/uploads/2016/09/750-426-ProtoNode-Cloud.pdf. Ask Cleaver-Brooks or its representative for the current revision.
What are the minimum BACnet points to integrate the Cleaver-Brooks Hawk 5000 boiler control (ProtoNode)?
Start with AI 1 Steam Press (Steam pressure); AI 17 Steam Press SP (Steam pressure setpoint); AI 2 Drum Level (Drum level); AI 23 Firing Rate (Firing rate); BI 1 Comb Air Blower Running (Combustion air blower running); BI 38 Load Demand (Load demand); BI 148 Burner Control Fault Alm (Burner control fault alarm); BI 14 Lo Water Cutoff (LWCO) (Low water cutoff).
How do I check these points on the real Hawk 5000 boiler control (ProtoNode)?
Scan the network with a BACnet IP browser such as Easy BACnet, open the device and compare its object list with this table. Anything missing is usually an option that isn't installed or a point that is disabled in the controller's configuration.
More Cleaver-Brooks BACnet points lists
- Boiler feedwater deaerator and surge tank controller via BACnet gateway
Cleaver-Brooks ADAC 1000 deaerator / surge tank control (ProtoNode, EtherNet/IP)
Cleaver-Brooks deaerator and surge tank packages with the ADAC 1000 PLC control, read through a ProtoNode RER gateway over EtherNet/IP.
Also known as: ADAC 1000, ADAC_1000, ProtoNode RER, 750-426 - Boiler feedwater deaerator and surge tank controller via BACnet gateway
Cleaver-Brooks ADAC deaerator / surge tank control (ProtoNode)
Cleaver-Brooks deaerator and surge tank packages with the ADAC control, read through a ProtoNode RER gateway.
Also known as: ADAC, CB deaerator control, ProtoNode RER, 750-426 - Boiler flame safeguard via BACnet gateway
Cleaver-Brooks CB120 flame safeguard (ProtoNode)
Cleaver-Brooks boilers with the CB120 flame safeguard, read through a ProtoNode RER gateway.
Also known as: CB120, CB 120, ProtoNode RER, 750-426 - Boiler flame safeguard via BACnet gateway
Cleaver-Brooks CB780 flame safeguard with expanded annunciator (ProtoNode)
Cleaver-Brooks boilers with the CB780 burner management control and expanded annunciator, read through a ProtoNode RER gateway.
Also known as: CB780, CB 780, CB780E, ProtoNode RER, 750-426 - Hot water boiler control via BACnet gateway
Cleaver-Brooks Falcon Hydronic boiler control (ProtoNode)
Cleaver-Brooks hot water boilers with the Falcon hydronic burner control, read through a ProtoNode RER gateway.
Also known as: Falcon Hydronic, ClearFire Falcon, CB Falcon, ProtoNode RER, 750-426 - Steam boiler control via BACnet gateway
Cleaver-Brooks Falcon Steam boiler control (ProtoNode)
Cleaver-Brooks steam boilers with the Falcon steam burner control, read through a ProtoNode RER gateway.
Also known as: Falcon Steam, CB Falcon steam, ProtoNode RER, 750-426 - Boiler flame safeguard and fuel-air ratio control via BACnet gateway
Cleaver-Brooks FARC with CB780 / CB783 burner control (ProtoNode)
Cleaver-Brooks boilers with a CB780/CB783 burner control and FARC fuel-air ratio control, read through a ProtoNode RER gateway.
Also known as: FARC, CB 780/783, CB783, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk 1000 boiler control (ProtoNode)
Cleaver-Brooks boilers with the Hawk 1000 PLC boiler control, read through a ProtoNode RER gateway.
Also known as: Hawk 1000, CB Hawk 1000, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk 2000 boiler control (ProtoNode)
Cleaver-Brooks boilers with the Hawk 2000 control, read through a ProtoNode RER gateway.
Also known as: Hawk 2000, CB Hawk 2000, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk 4000 boiler control (ProtoNode)
Cleaver-Brooks boilers with the Hawk 4000 PLC boiler control, read through a ProtoNode RER gateway.
Also known as: Hawk 4000, CB Hawk 4000, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk 4000 V2 boiler control (ProtoNode)
Cleaver-Brooks boilers with the HAWK 4000 V2 PLC boiler control, read through a ProtoNode RER gateway.
Also known as: HAWK 4000 V2, CB HAWK 4000 V2, HAWK_4000_V2, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk 4500 boiler control (ProtoNode, EtherNet/IP)
Cleaver-Brooks boilers with the Hawk 4500 PLC boiler control, read through a ProtoNode RER gateway over EtherNet/IP.
Also known as: Hawk 4500, CB Hawk 4500, ProtoNode RER, 750-426 - Steam or hot water boiler control via BACnet gateway
Cleaver-Brooks Hawk ICS boiler control (ProtoNode)
Cleaver-Brooks boilers with the Hawk ICS control, read through a ProtoNode RER gateway.
Also known as: Hawk ICS, CB ICS, ProtoNode RER, 750-426 - Boiler lead/lag master panel via BACnet gateway
Cleaver-Brooks Hawk Master Panel lead/lag (ProtoNode)
Cleaver-Brooks Hawk Master Panels sequencing up to eight Hawk boilers (A-H), read through a ProtoNode RER gateway.
Also known as: Hawk Master Panel, Hawk Master, CB Master Panel, ProtoNode RER, 750-426 - Boiler interface module via BACnet gateway
Cleaver-Brooks HSC Boiler Interface Module (ProtoNode)
Cleaver-Brooks HSC boiler interface modules (one boiler each), read through a ProtoNode RER gateway.
Also known as: Boiler Interface Module, HSC Boiler Interface, BIM, ProtoNode RER, 750-426 - Multi-boiler sequencer (hot water boiler plant) via BACnet gateway
Cleaver-Brooks HSC Hydronic System Controller (ProtoNode)
Cleaver-Brooks HSC panels sequencing up to 10 condensing and 10 non-condensing boilers, read through a ProtoNode RER gateway.
Also known as: HSC, Hydronic System Controller, CB HSC, ProtoNode RER, 750-426 - Pump interface module (boiler plant pumps) via BACnet gateway
Cleaver-Brooks HSC Pump Interface Module (ProtoNode)
Cleaver-Brooks HSC pump interface modules (up to four system pumps), read through a ProtoNode RER gateway.
Also known as: Pump Interface Module, HSC Pump Interface, ProtoNode RER, 750-426 - Boiler water level controller via BACnet gateway
Cleaver-Brooks LCS Level Control System (ProtoNode)
Cleaver-Brooks LCS water level controllers (one or two tanks), read through a ProtoNode RER gateway.
Also known as: LCS, Level Control System, ProtoNode RER, 750-426 - Boiler feed pump controller via BACnet gateway
Cleaver-Brooks PCS Pump Control System (ProtoNode)
Cleaver-Brooks PCS pump controllers (up to four pumps on header pressure or tank level), read through a ProtoNode RER gateway.
Also known as: PCS, Pump Control System, ProtoNode RER, 750-426 - Electric power meter via BACnet gateway
Cleaver-Brooks Shark 100 power meter profile (ProtoNode)
Shark 100 power meters supplied on Cleaver-Brooks equipment, read through a ProtoNode RER gateway.
Also known as: Shark 100, Electro Industries Shark 100, ProtoNode RER, 750-426 - Electric power meter via BACnet gateway
Cleaver-Brooks Shark 200 power meter profile (ProtoNode)
Shark 200 power meters supplied on Cleaver-Brooks equipment, read through a ProtoNode RER gateway.
Also known as: Shark 200, Electro Industries Shark 200, ProtoNode RER, 750-426 - Process loop controller via BACnet gateway
Cleaver-Brooks UDC 2500 loop controller profile (ProtoNode)
Honeywell UDC 2500 loop controllers supplied on Cleaver-Brooks equipment, read through a ProtoNode RER gateway.
Also known as: UDC 2500, UDC2500, Honeywell UDC 2500, ProtoNode RER, 750-426
Source: Cloud Enabled ProtoNode Gateway Startup Guide (RER/LER) for interfacing Cleaver-Brooks products · 750-426 · rev. 03/2018. Object names, instances and units are reproduced as published; descriptions are our own.