Easy BACnet
  1. Home
  2. BACnet points lists
  3. Veris
  4. E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP)

Power and energy meter (bi-directional) · BACnet points list

Veris E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP) BACnet points list

Updated 12 November 2026Unofficial source

Short answer

The E51H2 and E51H5 are DIN-rail three-phase meters with a BACnet MS/TP port that measure energy in both directions. Measurements are 79 Analog Inputs (net, import and export energy per quadrant and per phase, power, demand, volts, amps, power factor, frequency, pulse counts), setup is in eleven writable Analog Values, and alerts are Binary Inputs that also roll up into AI 83. The E51H5 also has three Trend_Log objects.

This page lists 104 BACnet objects for the Veris E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP) — 11 of them writable — with each object’s type, instance number, name, engineering units and access. It is re-typed from a copy of Veris’s documentation hosted by Kele, not by Veris itself, so treat it as unofficial.

Manufacturer
Veris
Model
E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP)
Equipment
Power and energy meter (bi-directional)
Equipment type
Thermostats, sensors & meters
BACnet objects
104 (11 writable)
Transport
BACnet MS/TP
Firmware
Not stated
Also known as
E51H2, E51H5, Veris E51, E51Hx, E51 Series, ZL0109
Source document
E51H2, E51H5 Power Monitoring Installation Guide · ZL0109-0B · rev. 2013-06 (unofficial copy, hosted by Kele)
Download CSV 104 rows Download EDE B.I.G.-EU JSON Source PDF (unofficial copy) ↗ Compare with your scan Download Easy BACnet Mobile App Google Play

Reference only, provided as-is: verify against Veris’s current documentation and the live device before use. Not official Veris information. Terms of use.

BMS integration notes: Veris E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP)

Integration in brief

Set the MS/TP address, baud and device ID on the meter screens, then set system type (AV 2), CT size (AV 3) and system voltage (AV 6). Trend import and export energy (AI 2, AI 3) and real power (AI 11), and watch the alert BIs or AI 83.

Minimum points to map

The short list most integrators start with — enough to run the unit from a BMS. Map more as the job needs.

ObjectNameWhyAccess
AI 2KWh_ImportReal energy import, kWhRead
AI 3KWh_ExportReal energy export, kWhRead
AI 1KWh_NetNet real energy (import minus export), kWhRead
AI 11KW_TotalTotal real power, kWRead
AI 19KW_Present_DemandPresent real power demand, kWRead
AI 14PF_TotalTotal power factorRead
AI 15Volts_LL_AvgAverage line-line voltageRead
AI 17Current_AverageAverage current, ARead
AI 18FrequencyFrequency, HzRead
AI 83Alarm_BitmapAll alert bits as one numberRead

Network setup

Watch out for

Veris E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP) BACnet objects

Type: AI, AO, AV, BI, BO, BV, MI/MO/MV (multi-state) · Access: Read read-only, Write writable, Command writable with a priority array.

104 of 104 shown
Type
Binary
Access
Show
Veris E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP) BACnet Points List
DescriptionStates
AV1ConfigCommand register; always reads 0Write
AV2System_Type10, 11, 12, 31 or 40 (see notes); default 40Write
AV3CT_Ratio_PrimaryCT primary current, 5-32000; default 100AWrite
AV4CT_Ratio_SecondaryCT output type: 1 = 1 V, 3 = 1/3 VWrite
AV5PT_RatioPT ratio 0.01-320; default 1 (no PT)Write
AV6System_VoltageSystem voltage (L-L except type 10); default 600VWrite
AV7Display_Units0 = IEC, 1 = IEEE (default)Write0=IEC; 1=IEEE
AV8Phase_Loss_Voltage_ThresholdPhase loss threshold, % of system voltage; default 10%Write
AV9Phase_Loss_Imbalance_ThresholdPhase imbalance threshold; default 25%Write
AV10SubintervalsSub-intervals per demand interval, 1-6; default 1Write
AV11Subinterval_LengthSub-interval length, 0.01 s; default 90000 (15 min)0.01 sWrite
AImin1KWh_NetNet real energy (import - export)kWhRead
AImin2KWh_ImportReal energy importkWhRead
AImin3KWh_ExportReal energy exportkWhRead
AI4KVARh_Q1Reactive energy, quadrant 1kVARhRead
AI5KVARh_Q2Reactive energy, quadrant 2kVARhRead
AI6KVARh_Q3Reactive energy, quadrant 3kVARhRead
AI7KVARh_Q4Reactive energy, quadrant 4kVARhRead
AI8Net_KVAhNet apparent energy (import - export)kVAhRead
AI9KVAh_ImportApparent energy importkVAhRead
AI10KVAh_ExportApparent energy exportkVAhRead
AImin11KW_TotalTotal real powerkWRead
AI12KVAR_TotalTotal reactive powerkVARRead
AI13KVA_TotalTotal apparent powerkVARead
AImin14PF_TotalTotal power factorRead
AImin15Volts_LL_AvgAverage L-L voltage of active phasesVRead
AI16Volts_LN_AvgAverage L-N voltage of active phasesVRead
AImin17Current_AverageAverage current of active phasesARead
AImin18FrequencyFrequency (QNAN if out of range)HzRead
AImin19KW_Present_DemandReal power present demandkWRead
AI20KVAR_Present_DemandReactive power present demandkVARRead
AI21KVA_Present_DemandApparent power present demandkVARead
AI22KW_Max_Demand_ImportReal power max demand, importkWRead
AI23KVAR_Max_Demand_ImportReactive power max demand, importkVARRead
AI24KVA_Max_Demand_ImportApparent power max demand, importkVARead
AI25KW_Max_Demand_ExportReal power max demand, exportkWRead
AI26KVAR_Max_Demand_ExportReactive power max demand, exportkVARRead
AI27KVA_Max_Demand_ExportApparent power max demand, exportkVARead
AI29Pulse_Count_1Pulse input 1 count (E51H2 name: Pulse Count)Read
AI30Pulse_Count_2Pulse input 2 count (E51H5 only; reserved on E51H2)Read
AI31KWh_Import_AReal energy import, phase AkWhRead
AI32KWh_Import_BReal energy import, phase BkWhRead
AI33KWh_Import_CReal energy import, phase CkWhRead
AI34KWh_Export_AReal energy export, phase AkWhRead
AI35KWh_Export_BReal energy export, phase BkWhRead
AI36KWh_Export_CReal energy export, phase CkWhRead
AI37KVARh_Q1_AReactive energy Q1, phase AkVARhRead
AI38KVARh_Q1_BReactive energy Q1, phase BkVARhRead
AI39KVARh_Q1_CReactive energy Q1, phase CkVARhRead
AI40KVARh_Q2_AReactive energy Q2, phase AkVARhRead
AI41KVARh_Q2_BReactive energy Q2, phase BkVARhRead
AI42KVARh_Q2_CReactive energy Q2, phase CkVARhRead
AI43KVARh_Q3_AReactive energy Q3, phase AkVARhRead
AI44KVARh_Q3_BReactive energy Q3, phase BkVARhRead
AI45KVARh_Q3_CReactive energy Q3, phase CkVARhRead
AI46KVARh_Q4_AReactive energy Q4, phase AkVARhRead
AI47KVARh_Q4_BReactive energy Q4, phase BkVARhRead
AI48KVARh_Q4_CReactive energy Q4, phase CkVARhRead
AI49KVAh_Import_AApparent energy import, phase AkVAhRead
AI50KVAh_Import_BApparent energy import, phase BkVAhRead
AI51KVAh_Import_CApparent energy import, phase CkVAhRead
AI52KVAh_Export_AApparent energy export, phase AkVAhRead
AI53KVAh_Export_BApparent energy export, phase BkVAhRead
AI54KVAh_Export_CApparent energy export, phase CkVAhRead
AI55KW_AReal power, phase AkWRead
AI56KW_BReal power, phase BkWRead
AI57KW_CReal power, phase CkWRead
AI58KVAR_AReactive power, phase AkVARRead
AI59KVAR_BReactive power, phase BkVARRead
AI60KVAR_CReactive power, phase CkVARRead
AI61KVA_AApparent power, phase AkVARead
AI62KVA_BApparent power, phase BkVARead
AI63KVA_CApparent power, phase CkVARead
AI64PF_APower factor, phase ARead
AI65PF_BPower factor, phase BRead
AI66PF_CPower factor, phase CRead
AI67Volts_ABVoltage A-BVRead
AI68Volts_BCVoltage B-CVRead
AI69Volts_ACVoltage A-CVRead
AI70Volts_ANVoltage A-NVRead
AI71Volts_BNVoltage B-NVRead
AI72Volts_CNVoltage C-NVRead
AI73Current_ACurrent, phase AARead
AI74Current_BCurrent, phase BARead
AI75Current_CCurrent, phase CARead
AI76Max_PowerFull-scale powerkWRead
AI78Energy_ResetsCount of energy resetsRead
AI81Power_Up_CountCount of power-up cyclesRead
AI82Output_ConfigOutput configuration (E51H2 = 11, E51H5 = 10)Read
AImin83Alarm_BitmapAll alert bits BI1-BI15 as one numberRead
BI1Volts_Error_AVoltage out of range, phase ARead0=Inactive; 1=Active
BI2Volts_Error_BVoltage out of range, phase BRead0=Inactive; 1=Active
BI3Volts_Error_CVoltage out of range, phase CRead0=Inactive; 1=Active
BI4Current_Error_ACurrent out of range, phase ARead0=Inactive; 1=Active
BI5Current_Error_ACurrent out of range, phase B (name as printed)Read0=Inactive; 1=Active
BI6Current_Error_ACurrent out of range, phase C (name as printed)Read0=Inactive; 1=Active
BI7Frequency_ErrorFrequency out of rangeRead0=Inactive; 1=Active
BI9Phase_Loss_APhase loss, phase ARead0=Inactive; 1=Active
BI10Phase_Loss_BPhase loss, phase BRead0=Inactive; 1=Active
BI11Phase_Loss_CPhase loss, phase CRead0=Inactive; 1=Active
BI12Power_Factor_APower factor below 0.5, phase ARead0=Inactive; 1=Active
BI13Power_Factor_BPower factor below 0.5, phase BRead0=Inactive; 1=Active
BI14Power_Factor_CPower factor below 0.5, phase CRead0=Inactive; 1=Active
BI15RTC_ResetReal-time clock reset after power loss (E51H5 only)Read0=Inactive; 1=Active
Object ID lookup: Veris E51H2 / E51H5 bi-directional compact power and energy meter point IDs by name

Integration notes

Check it against the live device. A points list tells you what the controller can expose; the unit in front of you may differ by firmware or installed options. This list is provided as-is for reference only and may contain mistakes — confirming it before you write, map or commission anything is up to you (terms). Easy BACnet scans a network for BACnet IP devices from an Android phone, reads every object on the E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP) and exports what it actually has to Excel — free. New to BACnet? Start with what a BACnet points list is and what the object types mean.

Questions about the Veris E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP)

How many BACnet points does the Veris E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP) have?

This list has 104 BACnet objects: 79 analog inputs, 11 analog values, 14 binary inputs. The exact set on a given unit depends on its firmware, installed options and configuration.

Which Veris E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP) BACnet points are writable?

11 of the 104 objects accept a write. Points marked Command have a priority array: a write holds until it is released, so release it back to automatic when you are done.

Where is the official Veris E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP) BACnet documentation?

Veris does not publish it on its own website. This list comes from E51H2, E51H5 Power Monitoring Installation Guide (ZL0109-0B), revision 2013-06, a copy hosted by Kele at https://assets.kele.com/Catalog/17%20Power%20Monitoring/PDFs/E51H2,%20E51H5%20Install%20Guide.pdf. Ask Veris or its representative for the current revision.

What are the minimum BACnet points to integrate the Veris E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP)?

Start with AI 2 KWh_Import (Real energy import, kWh); AI 3 KWh_Export (Real energy export, kWh); AI 1 KWh_Net (Net real energy (import minus export), kWh); AI 11 KW_Total (Total real power, kW); AI 19 KW_Present_Demand (Present real power demand, kW); AI 14 PF_Total (Total power factor); AI 15 Volts_LL_Avg (Average line-line voltage); AI 17 Current_Average (Average current, A); AI 18 Frequency (Frequency, Hz); AI 83 Alarm_Bitmap (All alert bits as one number).

How do I check these points on the real E51H2 / E51H5 bi-directional compact power and energy meter (BACnet MS/TP)?

Scan the network with a BACnet IP browser such as Easy BACnet, open the device and compare its object list with this table. Anything missing is usually an option that isn't installed or a point that is disabled in the controller's configuration.

More Veris BACnet points lists

Source: E51H2, E51H5 Power Monitoring Installation Guide · ZL0109-0B · rev. 2013-06. Object names, instances and units are reproduced as published; descriptions are our own.