Easy BACnet
  1. Home
  2. BACnet points lists
  3. Condair
  4. Condair DL (BACnet gateway board)

Hybrid humidifier BACnet gateway · BACnet points list

Condair Condair DL (BACnet gateway board) BACnet points list

Updated 28 October 2026

Short answer

Older or retrofit Condair DL units can reach BACnet IP or MS/TP through an optional ProtoCessor gateway board that maps the controller's Modbus data to BACnet objects. The virtual device exposes status, Ag-Ion hygiene data, pressures, PI settings, remote flush/wash-over commands and valve states.

This page lists 39 BACnet objects for the Condair Condair DL (BACnet gateway board) — 7 of them writable — with each object’s type, instance number, name, engineering units and access. It is re-typed from Condair’s own free documentation, linked below.

Manufacturer
Condair
Model
Condair DL (BACnet gateway board)
Equipment
Hybrid humidifier BACnet gateway
Equipment type
Humidifiers
BACnet objects
39 (7 writable)
Transport
BACnet IP, BACnet MS/TP
Firmware
Integrated Controller 5.9.x.x
Default device instance
300 (BACnet IP); 1001 (MS/TP)
Also known as
Virtual_BCU_DL, DL ProtoCessor gateway, BMS DL BACnet
Source document
Gateway Board for BACnet and LonWorks - Supplemental Installation and Operation Manual · 2585293-L · rev. 2022-02
Download CSV 39 rows Download EDE B.I.G.-EU JSON Manufacturer PDF ↗ Download Easy BACnet Mobile App Google Play

BMS integration notes: Condair Condair DL (BACnet gateway board)

Integration in brief

Configure the DL controller for Modbus RTU (address 10, even, 9600) with Signal Source = Modbus, set the gateway's BACnet IP or MS/TP parameters, then write demand or RH to AO 1. Watch BI 14 to confirm the gateway still sees the humidifier.

Minimum points to map

The short list most integrators start with — enough to run the unit from a BMS. Map more as the job needs.

ObjectNameWhyAccess
AO 1AO_RemRHorDemDemand or measured RH from the BMSCommand
AV 1AV_SetPointHumHumidity setpoint used in RH P/PI modeWrite
MI 1MI_HumStatusOperating statusRead
AI 6AI_ActCapHumActual spray water outputRead
BI 14BI_ConnectionGateway-to-humidifier node statusRead
MI 2MI_ServStatusMaintenance/fault statusRead
AI 1AI_ErrorCodeActive error codeRead

Enable & remote start

Set Control Settings (password 0335) > Signal Source to Modbus, choose the Control Mode (Demand, RH P or RH PI), and set the controller's Modbus RTU parameters to match the gateway.

Heartbeat & communication loss

Controller BMS Timeout (1-300 s, default 300 s): if the control signal is not updated within the timeout, warning W35 BMS Timeout is raised and humidification stops until a valid signal returns. The gateway only forwards the control value to the humidifier when it changes.

Sensors & values from the BMS

In Demand mode the BMS writes the required output (0-100 %) to the AO 1. In RH P or RH PI mode the BMS writes the measured humidity there and the controller's own setpoint, P-band and I-time AVs do the control. Do not connect a hard-wired demand or sensor signal while the BACnet signal is used.

Network setup

Watch out for

Condair Condair DL (BACnet gateway board) BACnet objects

Type: AI, AO, AV, BI, BO, BV, MI/MO/MV (multi-state) · Access: Read read-only, Write writable, Command writable with a priority array.

39 of 39 shown
Type
BinaryMulti-stateOther
Access
Show
Condair Condair DL (BACnet gateway board) BACnet Points List
DescriptionStates
DEV300Virtual_BCU_DLHumidifier DLRead
MImin1MI_HumStatusOperating statusRead1=Initializing, 2=Diagnostic, 3=Stopped, 4=Flushing, 5=Standby, 6=Flushed, 7=Humidifying, 8=Ready, 9=Refreshing, 10=Air Pressure Cleaning, 11=Filling, 12=Conductivity Flush, 13=Switched Off, 14=Remote Off, 15=Regenerating, 16=Temperature Flush, 17=Ceramic Wash Over
MImin2MI_ServStatusMaintenance and malfunctions statusRead1=Service Info, 2=Warning, 3=Activation Code, 4=Out of Commissioning, 5=Refill Disinfection, 6=Service, 7=Fault, 8=Replace Ag Cartridge, 9=Disinfection
MI3MI_HumTypeDevice typeRead1=Hum, 2=Hum + FC, 3=Hum + RO-C, 4=Hum + FC-off
AImin1AI_ErrorCodeError codeRead0=no Error
AI2AI_OperatHoursOperating hourshRead
AI3AI_HoursToServNext servicehRead
AI4AI_RHorDemandActual humidity or demand%Read
AI5AI_MaxHumOutMax. capacitykg/h or lb/hRead
AImin6AI_ActCapHumActual capacitykg/h or lb/hRead
AI7AI_RemCapSilvRemaining Ag-Ion capacityAhRead
AI8AI_TaAgCurrentTarget Ag-Ion currentmARead
AI9AI_PressInletInlet pressure PS4bar or psiRead
AI10AI_PressNozzleNozzle pressure PS5bar or psiRead
AI11AI_ActPermTempWater temperature°C or °FRead
AI12AI_ActPermCondConductivityµS/cmRead
AI13AI_PumpCurrentPump currentARead
AI14AI_AgCurrentAg-Ion currentmARead
AVmin1AV_SetPointHumHumidity setpoint%Write
AV2AV_PropBandProportional band%Write
AV3AV_IntTimeIntegral timeminWrite
AV4AV_CapLimitManual capacity%Write
AV5AV_RemoteFlushRemote flushWriteRead: 0=Off, 2=Flushing active, Write: 0=Stop flushing, 1=Start flushing
AV6AV_CeramicWashOverCeramic wash overWriteRead: 0=Off, 2=Ceramic wash over active, Write: 0=Stop ceramic wash over, 1=Start ceramic wash over
AOmin1AO_RemRHorDemActual humidity or demand via BACnet%Command
BI1BI_ExtSChStaSafety loopRead0=Open, 1=Closed (ok)
BI2BI_ValveY1Y1 inlet valveRead0=Closed, 1=Open
BI3BI_ValveY2Y2 valveRead
BI4BI_ValveY3Y3 valve air cleaningRead0=Closed, 1=Open
BI5BI_ValveY4Y4 valve external pipe flushRead0=Closed, 1=Open
BI6BI_StageValveY5Y5 valve spray circuitRead0=Closed, 1=Open
BI7BI_StageValveY6Y6 valve spray circuitRead0=Closed, 1=Open
BI8BI_StageValveY7Y7 valve spray circuitRead0=Closed, 1=Open
BI9BI_StageValveY8Y8 valve spray circuitRead0=Closed, 1=Open
BI10BI_StageValveY9Y9 valve spray circuitRead0=Closed, 1=Open
BI11BI_DrainValY10Y10 valve drain (NO)Read0=Open, 1=Closed
BI12BI_ValveY11Y11 auxiliary outlet valveRead0=Open, 1=Closed
BI13BI_PumpFC enableRead0=Disable, 1=Enable
BImin14BI_ConnectionNode statusRead0=Node offline, 1=Node online

Integration notes

Check it against the live device. A points list tells you what the controller can expose; the unit in front of you may differ by firmware or installed options. Easy BACnet scans a network for BACnet IP devices from an Android phone, reads every object on the Condair DL (BACnet gateway board) and exports what it actually has to Excel — free. New to BACnet? Start with what a BACnet points list is and what the object types mean.

Questions about the Condair Condair DL (BACnet gateway board)

How many BACnet points does the Condair Condair DL (BACnet gateway board) have?

This list has 39 BACnet objects: 14 analog inputs, 1 analog output, 6 analog values, 14 binary inputs, 1 device, 3 multi-state inputs. The exact set on a given unit depends on its firmware, installed options and configuration.

Which Condair Condair DL (BACnet gateway board) BACnet points are writable?

7 of the 39 objects accept a write. Points marked Command have a priority array: a write holds until it is released, so release it back to automatic when you are done.

Where is the official Condair Condair DL (BACnet gateway board) BACnet documentation?

The source is Gateway Board for BACnet and LonWorks - Supplemental Installation and Operation Manual (2585293-L), revision 2022-02, published free by Condair at https://www.condair.com/consense/bms-communication-ic-1.0/am_bms_interface_2585293_en_condairltd.pdf.

What are the minimum BACnet points to integrate the Condair Condair DL (BACnet gateway board)?

Start with AO 1 AO_RemRHorDem (Demand or measured RH from the BMS); AV 1 AV_SetPointHum (Humidity setpoint used in RH P/PI mode); MI 1 MI_HumStatus (Operating status); AI 6 AI_ActCapHum (Actual spray water output); BI 14 BI_Connection (Gateway-to-humidifier node status); MI 2 MI_ServStatus (Maintenance/fault status); AI 1 AI_ErrorCode (Active error code).

How do I enable BMS control of the Condair Condair DL (BACnet gateway board)?

Set Control Settings (password 0335) > Signal Source to Modbus, choose the Control Mode (Demand, RH P or RH PI), and set the controller's Modbus RTU parameters to match the gateway.

Does the Condair Condair DL (BACnet gateway board) need a BACnet heartbeat or have a communication timeout?

Controller BMS Timeout (1-300 s, default 300 s): if the control signal is not updated within the timeout, warning W35 BMS Timeout is raised and humidification stops until a valid signal returns. The gateway only forwards the control value to the humidifier when it changes.

Can the BMS supply sensor values to the Condair Condair DL (BACnet gateway board)?

In Demand mode the BMS writes the required output (0-100 %) to the AO 1. In RH P or RH PI mode the BMS writes the measured humidity there and the controller's own setpoint, P-band and I-time AVs do the control. Do not connect a hard-wired demand or sensor signal while the BACnet signal is used.

How do I check these points on the real Condair DL (BACnet gateway board)?

Scan the network with a BACnet IP browser such as Easy BACnet, open the device and compare its object list with this table. Anything missing is usually an option that isn't installed or a point that is disabled in the controller's configuration.

More Condair BACnet points lists

Source: Gateway Board for BACnet and LonWorks - Supplemental Installation and Operation Manual · 2585293-L · rev. 2022-02. Object names, instances and units are reproduced as published; descriptions are our own.